Laserfiche WebLink
HARRIS COUNTY, TEXAS <br />ENGINEERING COST ESTIMATE <br />LEFT TURN LANE CONSTRUCTIONS AT THE INTERSECTIONS OF FAIRMONT PARKWAY (22583-3-4) <br />AT BROOKWOOD DRIVE, WILMONT DRIVE, AND FARRINGTON BOULEVARD <br />IN HARRIS COUNTY, PRECINCT 2 <br />KLOTZ ASSOCIATES PROJECT NO.11678 <br />BIID TABULATION SHEET <br />ITEM <br />NO. <br />SPEC <br />ITEM NO. <br />I QUAN. <br />UNIT <br />BID ITEM DESCRIPTION <br />AAA Asphalt Paving, Inc. <br />Pedko Paving, Inc. <br />Silva, Inc. <br />. UNIT <br />PRICE <br />AMOUNT <br />BID <br />UNIT <br />PRICE <br />AMOUNT <br />BID <br />UNIT <br />PRICE. <br />AMOUNT <br />BID <br />A. SITE PREPARATION AND EARTHWORK ITEMS <br />1 <br />110 • <br />1,612 <br />CY <br />lRoadway excavation <br />$14.00 <br />$22,568.00 <br />$18.00 <br />$29,016.00 <br />$15.75 <br />$25,389.00 <br />2 <br />165 <br />1.5 <br />AC. <br />Hydro mulch seeding <br />$3,000.00 <br />$4,500.00 <br />$1,500.00 <br />$2,250.00 <br />$1,000.00 <br />$1,500.00 <br />3 <br />562 <br />3 <br />1 <br />LS <br />Right of way preparation <br />$3,000.00 • <br />$9,000.00 <br />$200.00 <br />$600.00 <br />$2,170.00 <br />$6,510.00 <br />4 <br />540 <br />920 <br />SY <br />lRemoving existing asphalt pavement and base (all depths) <br />$10.00 <br />$9,200.00 <br />$2.50 <br />$2,300.00 <br />$8.00 <br />$7,360.00 <br />SUBTOTAL A. SITE PREPARATION AND EARTHWORK ITEMS <br />$45,268.00 <br />$34,166.00 <br />$40,759.00 <br />B. PAVEMENT ITEMS <br />5 <br />220 <br />3,450 <br />SY <br />Lime manipulation of subgrade <br />$6.00 <br />$20,700.00 <br />$6.00 <br />$20,700.00 <br />$4.10 <br />$14,145.00 <br />6 <br />221 <br />83.4 <br />TON <br />Hydrated lime and lime slurry for subgrade stabilization (7%) <br />$110.00 <br />$9,174.00 <br />$100.00 <br />$8,340.00 <br />$94.50 <br />$7,881.30 <br />7 <br />250 <br />2,233.7 <br />TON <br />Hot -mix asphalt concrete base course, (12" black base) for <br />roadway pavements <br />$43.00 <br />$96,049.10 <br />$42.00 <br />$93,815.40 <br />$39.20 <br />$87,561.04 <br />$ <br />250 <br />465.4 <br />TON <br />Hot -mix asphaltic concrete surfacing (2.5" depth) for surface <br />and overlay pavements <br />$40.00 <br />$18,616.00 <br />$66.00 <br />$30,716.40 <br />$48.50 <br />$22,571.90 <br />SUBTOTAL B. PAVEMENT ITEMS <br />$144,539.10 <br />$153,571.80 <br />$132,159.24 <br />C. TRAFFIC CONTROL ITEMS <br />9 <br />624 <br />4 <br />MO <br />Traffic control <br />$5,000.00 <br />$20,000.00 <br />$2,500.00 <br />$10,000.00 <br />$9,000.00 <br />$36,000.00 <br />10 <br />665 <br />8,510 <br />LF <br />Work zone pavement markings, white 4" width <br />$1.50 <br />$12,765.00 <br />$0.65 <br />$5,531.50 <br />$1.36 <br />$11,573.60 <br />11 <br />665 <br />160 <br />LF <br />Work zone pavement markings, white 24" width <br />$7.00 <br />$1,120.00 <br />$6.20 <br />$992.00 <br />$6.12 <br />$979.20 <br />12. <br />665 <br />4,260 <br />LF <br />Work zone pavement markings, yellow 4" width <br />$1.50 <br />$6,390.00 <br />$O.GS <br />$2,769.00 <br />$1.36 <br />$5,793.60 <br />13 <br />250 <br />.67 <br />TON <br />Hot -mix asphalt concrete pavement, (12" black base) for <br />temporary detour pavements <br />$50.00 <br />$3,350.00 <br />$50.00 <br />$3,350.00 <br />$100.00 <br />$6,700.00 <br />SUBTOTAL C. TRAFFIC CONTROL ITEMS <br />$43,625.00 <br />$22,642.50 <br />$61,046.40 <br />D. STORM WATER POLLUTION PREVENTION ITEMS <br />14 <br />724 <br />210 1 <br />SY <br />Stabilized construction zccess (Type I - Rock) <br />$20.00 <br />$4,200.00 <br />$9.00 <br />$1,890.00 <br />$18.20 <br />$3,822.00 <br />15 <br />713 <br />1,200 1 <br />LF lReinforced <br />filter fabric barrier with staking <br />$2.00 <br />$2,400.00 <br />$1.50 <br />$1,800.00 <br />$2.30 <br />$2,760.00 <br />SUBTOTAL D. STORM WATER POLLUTION PREVENTION ITEMS' <br />$6,600.00 <br />$3,690.00 <br />$6,582.00 <br />T, 11/26/2003 Page I bid tabulation FAIRMON'r <br />