Laserfiche WebLink
r-I <br />Pg. 3 <br />j�. <br />Cost. <br />Based on Centerpoint Energy's current streetlighting rates, the monthly service cost of this plan <br />will be $64.27. The annual cost of the North "IF' Street project will be $771.24 based on the <br />following: <br />New 9500 Lumen light/existing pole: $3.49/Month x 12 Months = $41.88/Year x 16 lights = $670.08 <br />New 16,000 Lumen light/existing pole: $3.49/h4onth x 12 Months = $41.88/Year x 1 lights = $41.88 <br />New 25,500 Lumen light/existing pole: $4.94/Month x 12 Months = 59.28/Year x 1 light = $59.28 <br />Total Annual Cost for North "L"St & North "H" St Streedighting Project = $1,542.48 <br />NORTH "D" STREET & JOSH WAY <br />North "D" Street (Sens Road to End): <br />Existing Conditions: <br />North "D" Street is a City -maintained, 2-Lane, asphalt road with an open -ditch drainage system. <br />In reference to the City of La Porte's Comprehensive Thoroughfare Plan this road serves as a <br />local street to the Spencer Landing Subdivisions. <br />The average spacing between existing streetlights along the roadway is 260'. There are currently <br />a total of 40 power poles along North "D" St. Of these, 13 poles are equipped with a streetlight. <br />Recommendation: <br />Our recommendation calls for adding 1 (25,500 Lumen — 250 Watt) on an existing pole at the <br />intersection of North "D" Street and Sens Road. Consideration for this brighter streetlight will <br />assist in minimizing visibility safety hazards.for motorists in this intersection of a collector and <br />primary arterial road. <br />