Laserfiche WebLink
<br />eMf Job No. 03-093 <br /> <br />City of La Porte <br />Public Work's Metal Building <br /> <br />(e) Ouestions - Submit questions about bidding documents to the Engineer. Inquiries are <br />permitted until one week prior to bid opening. Necessary replies will be issued to <br />bidders of record as addenda, which become a part of the bidding documents. <br />Bidders should contact the Engineer not less than 72 hours before bid opening to <br />secure any addenda that may affect bidding. <br /> <br />(f) Qualifications of Bidders - The Low Bidder will be asked to submit a statement of <br />the qualifications of the Bidder to properly execute the work. Include in the <br />statement of qualifications a list of ten (10) references minimum. The references <br />shall consist of projects of similar nature, cost of the project, owner's name, engineer <br />or prime contact and his telephone number. <br /> <br />(g) Right of Reiection - The owner reserves the right to reject the bid of any bidder if <br />evidence or investigation indicates that the bidder is not properly qualified, in the <br />opinion of the Owner, to complete the work satisfactorily or in the opinion of the <br />Owner, it is in the City's best interest that the bid be rejected. <br /> <br />Upon consideration of the proposals the City plans to award a Contract, however the <br />City reserves the right to reject any and all bids, to waive any and all formalities and <br />technicalities, and to accept any bid which it deems advantageous to the City. Each <br />bidder agrees to waive any claim it has or may have against the Owner, the Engineer, <br />and their respective employees, arising out of or in connection with the <br />administration, evaluation or recommendation of any bid. The successful bidder will <br />be required to furnish a performance bond and payment bond in an amount of 100% <br />of the total contract price. <br /> <br />(h) Reiection of Irregular or Improper Bid - Any bid which contains any omission, <br />alteration, erasure, addition or change of any nature, or which does not include prices <br />for each and every bid item (excluding optional items) may, at the option of Owner, <br />be deemed irregular. In order for any such bid to be considered, any alteration, <br />erasure or other change must be initialed by the bidder prior to submission of the bid. <br />In addition, any bid in which the prices are obviously unbalanced or which fails in <br />any manner to conform to the bidding procedures as set forth may be considered <br />irregular. Any bid proposal which is deemed irregular may be rejected and returned <br />to the bidder without being considered. <br /> <br />Further, any proposal containing any conditions which provide for changes in the <br />stated bid price due to increases or decreases in the cost of materials, labor or other <br />items required for the project will be rejected and returned to the bidder without <br />being considered. <br /> <br />IB-3 <br />