Laserfiche WebLink
<br />City of La Porte <br />Public Work's Metal Building <br /> <br />(4) Sign in longhand below the typed name of the person authorized to bind the <br />bidder to a contract. When the bidder is a corporation, the bid must be signed <br />with the legal name of the corporation followed by the name of the state of <br />incorporation and the legal signature of a person authorized to bind the <br />corporation to a contract. <br /> <br />(c) Alternatives - Bidder shall bid Alternatives separately. <br /> <br />(d) Bid Security <br /> <br />(1) Include with the bid a cashier's check, certified check, or a bid bond for 5 <br />percent of the base bid amount. Make checks payable to the City of La Porte, <br />Texas. Bid bonds must be executed by the bidder and a surety company <br />which meet requirements of the conditions of the contract. <br /> <br />(2) The successful bidder's security will be retained until he has signed the <br />agreement, furnished the required performance and payment bonds, and <br />submitted any other required contract forms. The bid security will be <br />forfeited to the City by the successful bidder as damages for default if the <br />bidder fails to execute and deliver a contract and bonds as required. <br /> <br />(3) The City reserves the right to retain the security of the next two lowest <br />bidders until the successful bidder enters into the contract or until 90 days <br />after bid opening has passed. All other bid securities will be returned within <br />15 days of bid opening. <br /> <br />(e) Modification or Withdrawal . Bids may be modified or withdrawn by a written <br />request duly executed and delivered to the person who holds the bid at any time prior <br />to the opening of Bids. Bids may not be withdrawn or modified after bid opening <br />time unless the award of the contract has been delayed more than 60 days. <br /> <br />(f) ~ualification Information - As stated in the previous section. <br /> <br />(g) Trench Safety System - Contractor shall submit with his bid a certified statement of <br />his safety record over the past five (5) years. <br /> <br />4.0 CONTRACT REQUIREMENTS <br /> <br />(a) Award of Contract - Unless all bids are rejected, the Owner will award the Contract <br />as promptly as possible, consistent with the time required for a thorough analysis of <br />the bids submitted. However, the Owner reserves the right to delay award for sixty <br />(60) days after receipt of bids. If no award is made within sixty (60) days after <br />receipt of bids, a bidder may withdraw his bid without prejudice to himself by <br />submitting a written request for its withdrawal to the person who holds the bid. The <br />Contract will be awarded on the basis of all factors that are available to be judged by <br />the Owner and deemed by the Owner to be of the greatest advantage to it, considering <br /> <br />eM! Job No. 03-093 <br /> <br />IB-5 <br />