My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2010-5-10
LaPorte
>
City Secretary
>
Minutes
>
City Council
>
2010's
>
2010
>
2010-5-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:07:25 PM
Creation date
3/21/2025 2:18:22 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
5/10/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />=::= CobbFendley <br /> <br />April 29, 2010 <br /> <br />Mr. Steve Gillett <br />Director of Public Works <br />City of La Porte <br />604 West Fairmont Parkway <br />La Porte, Texas 77571 <br /> <br />VIA E.MAIL <br />ORIGINAL BY MAIL <br /> <br />Re: Recommendation of Contract Award <br />McCabe Road Sanitary Sewer and Sidewalk Improvements <br />Sealed Bid #10022 <br />CFA No. 0912-015-00 <br /> <br />Dear Steve: <br /> <br />Bids received at 2:00 p.m. on April 29, 2010, have been reviewed for completeness and <br />accuracy. The bid tabulation is attached. <br /> <br />Aranda Brothers Construction turned in the low base bid. They are contractors for Fort Bend <br />County, Harris County, and TxDOT. For the work scope involved, their qualifications would <br />seem adequate. Their submitted bid contained mathematical errors that have been resolved in <br />favor of the indicated unit prices, as detailed in the Instructions to Bidders contained in the <br />bidding documents. The corrected figures are shaded on the tabulation and the corrected base <br />bid sum is $348,808.75. The corrected base bid is $18,060.00 lower than the sum of <br />$366,868.75 that was indicated on the bid form. <br /> <br />CobbFendley is recommending that a construction contract for the base bid project be awarded <br />to Aranda Brothers Construction in the amount of $348,808. 75. <br /> <br />Sincerely, <br /> <br />n' ~NDLEY & ASSOCIATES, INC. <br /> <br />~9~P- <br /> <br />Vice presi~~ <br /> <br />cc: Armando Aranda, Aranda Brothers <br />Heath Lyle, CobbFendley <br />File <br /> <br />D:\CFA\2009\12015.mccabe_rd\ENG\Bid Phase\Ltr. Bid recommendation.doc <br /> <br />13430 Northwest Freeway, Suite 1100 I Houston, Texas 77040 I 713.462.3242 I fax 713.462.3262 I www.cobfen.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.