My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Minutes 11-5-98
LaPorte
>
City Secretary
>
Minutes
>
Comprehensive Plan Steering Committee
>
1998
>
Minutes 11-5-98
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2025 9:26:11 PM
Creation date
3/21/2025 2:26:52 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
Comprehensive Plan Steering Committee
Meeting Doc Type
Minutes
Date
11/5/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Comprehensive Plan Update <br />Steedng Committee <br />Minutes of November 5, 1998 <br />Page 3 of <br />Emergency Warning System <br />Public transportation <br />Streamline building permit process <br />Police — foot patrols, bike, known drug areas <br />City lighting <br />Landscaping <br />Mosquitoes and fire ants <br />Maintain easements and alleyways <br />Animal control <br />Demolition <br />Community service program <br />Clean trash out of open ditches <br />Infrastructure <br />Drainage — underground <br />Streets and sidewalks (width) <br />Fire hydrants <br />Bike lanes <br />Finish paving 1/2 paved streets <br />Traffic signals <br />Turn lanes <br />Concrete streets for main thoroughfares (better construction standards) <br />Pedestrian crosswalks <br />City signage <br />Curbwork <br />Equal provision of infrastructure improvements around the City <br />VI. Discuss Preparation of Goals and Objectives. <br />Mr. Keast provided examples of the City of Lockhart's goals and <br />objectives to assist the Committee in assigning goals and objectives for <br />each of the subcategories. The following were identified as Drainage <br />Goals: <br />Goal 1: Correct existing problems <br />a) identify existing problem areas <br />b) maintain existing infrastructure <br />c) develop a drainage plan w/ established priorities <br />d) capital funds <br />e) coordinate w/ other governmental agencies <br />f) ensure sufficient easements/right-of-way (ROW) <br />Goal 2: Prevent future problems <br />a) ensure there are sufficient easements/ROW <br />b) ensure evacuation routes are well drained in case of hurricane <br />c) establish guidelines and standards for infrastructure <br />d) revise/update building codes & ordinances <br />
The URL can be used to link to this page
Your browser does not support the video tag.