<br />3. Drainage Improvements along Driftwood Drive - The initial solution included <br />the installation of additional 36" and 60" outfall from Driftwood to the detention <br />basin. The consultant has concluded that this proposal may not produce the <br />desired reduction in ponding along Driftwood. Klotz recommended the <br />construction of curb cuts and overland sheet flow paths be constructed from <br />Driftwood into the outfall ditch (west side of Driftwood) and from Driftwood into <br />the detention pond (east side of Driftwood) to help the street drain faster <br />during major rainfall events. Additionally, Klotz is examining the desirability of <br />an interconnect of the two existing outfalls from the detention pond to the <br />outfall ditch. Works completed to date includes beginning the construction of <br />both sheet flow structures. As of the date of this report, the east outfall is 75% <br />complete and the west outfall is 25% complete. Klotz has not yet determined <br />the feasibility of the interconnect. Additionally, Klotz is examining the <br />feasibility of constructing an additional storm sewer from the Mesquite <br />intersection with Driftwood to the outfall ditch. <br /> <br />4. Fleetwood Drive Outfall Pipe Upsizing - The initial proposal to enlarge and/or <br />add additional underground outfall at the end of Fleetwood Drive at Mesquite <br />has been tabled until additional analysis is perform by Klotz. It appears that a <br />more effective solution would be to provide for an emergency flow path be <br />constructed between the existing houses at this location to the outfall ditch. <br />Additional analysis is underway by Klotz to examine as-built construction <br />plans to determine other options. At this time, a short-term solution is not <br />available. <br /> <br />5. Glen Meadows Subdivision Interceptor Inlets - The initial solution was to add <br />additional outlets along Spencer Highway at the intersection of Valley Brook to <br />divert runoff from Spencer into the subdivision directly to Big Island Slough. <br />Harris County Precinct 2 is currently designing the proposed improvements, <br />and has indicated bidding in the near future. Klotz has noted in its initial <br />assessment that only 9 inlets are located along valley Brook, and that, during <br />a heavy rainfall event, water ponds along the low point near Meadow Crest <br />and results in flooding in the adjacent areas. Klotz is evaluating the feasibility <br />of upsizing the existing outfall pipes or providing a sheet flow path between <br />existing homes. Staff has also ordered additional slotted grates for area inlets <br />to improve runoff. Finally, a resident has suggested angling the outfall <br />structures downstream to improve flow into the outfall ditch. Klotz will also be <br />examining this proposal for effectiveness. <br /> <br />Additional information should be available at the March 25, 2008 committee meeting. <br /> <br />. Page 2 <br />