Laserfiche WebLink
<br />CITY OF LA PORTE <br />PUBLIC WORKS <br />DEPARTMENT <br /> <br />Memo <br /> <br />To: Drainage and Flooding Committee <br />From: Steve Gillett, Director of Public Works <br />CC: Ron Bottoms, City Manager <br />Date: March 18, 2008 <br />Re: Status Report - Short- Term Drainage Projects <br /> <br />As of this date, the following actions have been taken on short-term solutions to <br />drainage problems, as previously identified by the Planning Department. <br /> <br />1. Catlett Lane Pavement Replacement - The identified solution is to remove <br />approximately 94 feet of pavement and reconstruct to a lower elevation to <br />provide a sheet flow path from the intersection to Big Island Slough. The city <br />has contracted with Texcor to perform this work. Work to date includes <br />mobilization, utility location (primarily SWB) and initial excavation of the outfall. <br />Removal of pavement, excavation of subgrade and replacement of pavement <br />will follow. Estimated completion time is 30 days, weather permitting. <br />Additionally, as previously reported, a separated inlet lead has been repaired, <br />and slotted manhole covers have been placed on all four inlets to aid in runoff <br />from the intersection. <br /> <br />2. Creekmont Park Overflow Path - The identified solution is to construct inlets <br />at the south end of the parking lot and construct an underground storm sewer <br />system northward to a yet to be identified easement to North H Street, <br />connecting to the existing storm sewer system draining Underwood Road, <br />eastward to Big Island Slough. Klotz has received original construction <br />drawings and the area drainage plans for this portion of Underwood to <br />determine if the existing system can handle the additional runoff. The City <br />Manager's office is working on identifying the appropriate property owner(s) to <br />obtain the necessary easement. Klotz is preparing a cost estimate to perform <br />the necessary engineering and to coordinate the Project with Harris County <br />Precinct 2. After design and coordination is completed, the Project will be bid. <br /> <br />. Page 1 <br />