My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
10-13-08 Drainage and Flooding Committee minutes
LaPorte
>
City Secretary
>
Minutes
>
Drainage and Flooding Committee
>
2008
>
10-13-08 Drainage and Flooding Committee minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2017 5:26:17 PM
Creation date
3/21/2025 2:27:54 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
Drainage and Flooding Committee
Meeting Doc Type
Minutes
Date
10/13/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />k lot z ~~t: ass 0 cia t e 5 <br /> <br />4.2.3 Storm Sewer System Improvements.................. .................... ...... 4-7 <br />4.2.4 Local Ponding Relief Using Sheet Flow Paths............................ 4-8 <br /> <br />4.3 <br /> <br />Identified Types of Remedies for Future Conditions .............................. <br />4.3.1 Assumed Detention Strategies for Development......................... <br />4.3.2 Channel Improvements................................................................ <br />4.3.3 Storm Sewer System Improvements............................................ <br />4.3.4 Local Ponding Relief Using Sheet Flow Paths............................ <br /> <br />4.4 <br /> <br />Identified Improvements.......................................................................... <br /> <br />SECTION 5 COST AND IMPLEMENTATION <br /> <br />5.1 <br /> <br />Recommended Drainage Improvements ................................................. <br />5.1.1 Costs of Feasible Remedies.... ....................... ....... ....................... <br />5.1.2 Recommended Improvement Proj ects......................................... <br />5.1.3 Order of Construction of Recommended Improvements ............ <br /> <br />4-9 <br />4-9 <br />4-11 <br />4-12 <br />4-12 <br /> <br />4-12 <br /> <br />5-1 <br />5-1 <br />5-2 <br />5-4 <br /> <br />5-6 <br />5-6 <br />5-6 <br />5-7 <br />5-8 <br />5-8 <br />. 5-10 <br />5-11 <br />5-11 <br />5-12 <br />5-12 <br />5-12 <br /> <br />5-13 <br />5-13 <br />5-14 <br />5-15 <br />5-16 <br />5-17 <br /> <br />5.2 <br /> <br />Implementation Issues ............................................................................. <br />5.2.1 Chance ofInformation or Details of Projects.............................. <br />5.2.2 Pre-Construction Requirements................................................... <br />5.2.3 Tidal and Tropical Storm Influences ........................................... <br />5.2.4 Design Frequencies.............................. ........................................ <br />5.2.5 Non-City Funding............................ ............................................ <br />5.2.6 Drainage Interaction with Other Cities........................................ <br />5.2.7 Implementation of Drainage Criteria................. ............. ............. <br />5.2.7.1 Provision of Sheet Flow Paths......................................... <br />5.2.7.2 Construction in Special Flood Hazard Areas .................. <br />5.2.7.3 Minimum Low Chord Clearances ................................... <br />5.2.7.4 Capacity Improvements in Storm Sewer Systems........... <br />5.2.7.5 Minimal Detention Levels and Numbers of Detention <br /> <br />Sites.......................................................................... ....... <br /> <br />5.2.7.6 Enforcement of Drainage Criteria ................................... <br />5.2.8 Issues in Regional Pond Development for Future Development <br />5.2.9 Existing Detention Issues......... ........ ............. ............ .................. <br />5.2.10 Easements, Right-of-Way, and Land Acquisitions ..................... <br />5.2.10 Ownership and Maintenance of Drainage Facilities.................... <br /> <br />Klotz Associates Project No. 0127.008.000 <br />January 2009 <br /> <br />TOC- 3 <br /> <br />La Porte Citywide Drainage Study <br />City of La Porte <br />
The URL can be used to link to this page
Your browser does not support the video tag.