Laserfiche WebLink
<br />k lot z C~l; ass 0 cia t e s <br /> <br />TABLES <br /> <br />Table 2-1 <br />Table 2-2 <br />Table 2-3 <br />Table 2-4 <br />Table 2-5 <br />Table 2-6 <br />Table 3-1 <br />Table 4-1 <br />Table 4-2 <br />Table 5-1 <br />Table 5-2 <br />Table 5-3 <br />Table 5-4 <br />Table 5-5 <br />Table 5-6 <br />Table 5-7 <br />Table 5-8 <br />Table 5-9 <br />Table 5-10 <br /> <br />List of Streams <br />Significant Drainage or Flooding Problems <br />Policy Weight for Flood Problem Intensity <br />Prioritizing Drainage Problems <br />Short- Term Projects <br />Sheet Flow Paths <br />Channel Analysis Summary <br />Identified Improvements for FEMA Channels <br />Identified Improvements for Non-FEMA Channels <br />Project Units Costs <br />Cost Summary of FEMA Channel Improvements <br />Cost Summary ofNon-FEMA Channel Improvements <br />Cost Summary of Relief Swales <br />Cost Estimates Breakdown <br /> <br />Cost Estimates Percentages <br />List of Proposed Improvements (Cost-Sorted) <br />List of Proposed Improvements (Loss-Sorted) <br />List of Proposed Improvements for Future Conditions (Cost-Sorted) <br />Ownership and Maintenance <br /> <br />TOC-4 <br /> <br />Klotz Associates Project No. 0127.008.000 <br />January 2009 <br /> <br />La Porte Citywide Drainage Study <br />City of La Porte <br />