Laserfiche WebLink
<br />Mr. Ron Bottoms <br />August 14, 2009 <br />Page 2 of 3 <br /> <br />equalize the flow in each pipe. Alternative 3 was the least expensive alternative with a <br />construction estimate of approximately $1.37M. <br /> <br />Previous Study Alternative 4 <br />Alternative 4 included lowering Fleetwood Drive approximately 1.7 feet from Mesquite <br />Drive north to Linwood, transitions to the side street and constructing a new 5 year storm <br />sewer system under Fleetwood. Portions of the existing storm sewer system would be in <br />conflict with the proposed lowered Fleetwood so a new 5 year storm sewer system was <br />proposed. The construction cost was estimated at $2.2M for Alternative 4. <br /> <br />Residents of Fairmont Park East Subdivision have made 'comments in support of <br />Alternative 4 over Alternative 3 during some of the Drainage Conilnittee meetings. <br /> <br />New detail survey data along Fleetwood ,. <br />The City of La Porte used staff resources to develop a detailed survey alol1gfleetwood. <br />The survey obtained more detail elevations andupdated.'information along Fleetwood <br />from Mesquite north to almost Spencer Highway. Tq~ ~urvey obtained detail elevations <br />along the roadway as well as elevati~rs of the storm sewer inlets along the side streets. <br />This new survey data allowed us to reev;allJate Fleetwoodinmore detail rather than using <br />only older reference drawings. As a resulfof the new survey a new Alternative 5 was <br />developed. <br /> <br />Alternative 5 <br />Alternative 5 include~ iowenngpart of Fleetwood Road from Mulberry Drive north to <br />South Spruce and constglcting qnew 5year storm sewer system. This alternative is shown <br />on the attached exhibitS and thetonstruction cost is estimated at $1.66M. The benefit of <br />this Alterna~veis to provide 'for better'sheet flow out of the subdivision during storm <br />events higher "than'jh;~ 5 ye?TTI' event but only includes the complete rebuilding of <br />FleetwQpd for abour.J,400 feet" Alternative 5 includes about 1,000 feet less of <br />impfbv'ements to Fleetwood compared to Alternative 4. This Alternative 5 is more <br />expensivetlian Alternative'} but also provides for more flow capacity during large storm <br />events by low~ri,rg the res1:fiction of flow along Fleetwood and allowing the large storm <br />event flows to couti,pue to flow south towards the ditch. <br /> <br />Overflow swale or storm sewer outfall pipe <br />As part of all of the alternatives evaluated an overflow swale or storm sewer outfall pipe <br />is proposed to be constructed from Fleetwood Drive to the receiving ditch to compliment <br />the capacity of the proposed Alternative. The overflow swale or storm sewer outfall pipe <br />are critical elements to improve the drainage for Fairmont Park East and need to be <br />constructed as a minimum even if changes or improvements to Fleetwood are delayed. <br /> <br />