My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
07-29-09 Drainage and Flooding Committee minutes
LaPorte
>
City Secretary
>
Minutes
>
Drainage and Flooding Committee
>
2009
>
07-29-09 Drainage and Flooding Committee minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2017 5:26:17 PM
Creation date
3/21/2025 2:28:17 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
Drainage and Flooding Committee
Meeting Doc Type
Minutes
Date
7/29/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Table 2 <br /> <br />Alternative-1 <br /> <br />Add a Parallel Storm Trunk under the Northbound Pavement of Fleetwood Drive <br />From HCFCD Unit 8106-02-00 (Outfall) to Sycamore Dr. North (2,950 LF) <br />Remove and Replace Northbound Pavement <br /> <br />Table 1 <br /> <br />Item Item Description Unit Estimated Unit Price Total Cost <br />No. Quantity <br />1 Mobilize & Prepare Right-of-Way (5% of Total) LS 1 $ 46,500 $ 46,500 <br />2 Remove & Dispose of Existing Pavement on One SY 4,425 $ 3.10 $ 13,720 <br />Side <br />3 Remove & Dispose of Existing 60" CMP LF 155 $ 16.00 $ 2,480 <br />4 Excavation CY 3,824 $ 4.60 $ 17,600 <br />5 7" Reinforced Concrete Pavement (Include SY 4,425 $ 40 $ 177,000 <br />Subgrade) <br />6 Inlets Types A, B, C EA 22 $ 2,700 $ 59,400 <br />7 24" Reinforced Concrete Pipe LF 330 $ 50 $ 16,500 <br />8 36" Reinforced Concrete Pipe LF 541 $ 75 $ 40,580 <br />9 48" Reinforced Concrete Pipe LF 236 $ 110 $ 25,960 <br />10 54" Reinforced Concrete Pipe LF 310 $ 140 $ 43,400 <br />11 60" Reinforced Concrete Pipe LF 556 $ 165 $ 91,740 <br />12 5' x 5' Reinforced Concrete Box LF 291 $ 190 $ 55,290 <br />13 6' x 5' Reinforced Concrete Box LF 823 $ 200 $ 164,600 <br />14 8' x 6' Reinforced Concrete Box LF 205 $ 350 $ 71,750 <br />15 60" Equalizer Pipe Between Both Stonm Trunks LF 120 $ 165 $ 19,800 <br />16 Junction Box EA 1 $ 10,000 $ 10,000 <br />17 Manholes EA 10 $ 3,000 $ 30,000 <br />18 Wingwall with Headwall EA 1 $ 25,000 $ 25,000 <br />19 5" Concrete Riprap SY 75 $ 42 $ 3,150 <br />20 Cement Stabilized Sand Ton 879 $ 100 $ 87,900 <br />21 Adjust & Grout Manholes EA 10 $ 1,000 $ 10,000 <br />22 SWppp LS 1 $ 20,000 $ 20,000 <br />Trunk Line & Pavement - Subtotal Construction: $ 1,032,370 <br />10% Contingency $ 103,237 <br />Trunk Line & Pavement - Total Construction: $ 1,135,607 <br />Total Construction & Enaineerina (12%1: $ 1,271,880 <br /> <br />Klotz Associates Project No. 0127.009.000 <br />August 2009 <br /> <br />Fairmont Park East and Brookglen Drainage Study <br />City of La Porte <br />
The URL can be used to link to this page
Your browser does not support the video tag.