Laserfiche WebLink
<br />Table 3 <br />Alternative-2A <br /> <br />Remove Existing Storm Trunk Line Adjacent to the Northbound Pavement of Fleetwood Drive from <br />HCFCD Unit 8106-02-00 (Outfall) to Sycamore Dr. North and Install New Storm Trunk Designed for a 5. <br />year Event Minimize Pavement Replacement & Utility Conflicts <br /> <br />Item Item Description Unit Estimated Unit Price Total Cost <br />No. Quantity <br />1 Mobilize & Prepare Right-of-Way (5% of Total) LS 1 $ 55,800.00 $ 55,800.00 <br />2 Remove & Dispose of Existing Pavement SY 293 $ 3.10 $ 910.00 <br />3 Remove & Dispose of Existing Storm Pipe LF 3,000 $ 16.00 $ 48,000.00 <br />4 Excavation CY 3,889 $ 4.60 $ 17,890.00 <br />5 7" Reinforced Concrete Pavement Repair SY 293 $ 40.00 $ 11,740.00 <br />(Include Subgrade) <br />6 Curb Ramps EA 21 $ 3,300.00 $ 69,300.00 <br />7 Inlets Types A, B, C EA 22 $ 2,700 $ 59,400.00 <br />8 24" Reinforced Concrete Pipe LF 330 $ 50 $ 16,500.00 <br />9 48" Reinforced Concrete Pipe LF 236 $ 110.00 $ 25,960.00 <br />10 60" Reinforced Concrete Pipe LF 540 $ 165.00 $ 89,100.00 <br />11 6' x 5' Reinforced Concrete Box LF 310 $ 200.00 $ 62,000.00 <br />12 7' x 5' Reinforced Concrete Box LF 849 $ 260.00 $ 220,740.00 <br />13 8' x 6' Reinforced Concrete Box LF 1,015 $ 350.00 $ 355,250.00 <br />14 Manholes Include Tie in Exist. Pipe EA 11 $ 3,000.00 $ 33,000.00 <br />15 Wingwall with Headwall EA 1 $ 25,000.00 $ 25,000.00 <br />16 5" Concrete Riprap SY 75 $ 42.00 $ 3,150.00 <br />17 Cement Stabilized Sand Ton 1,300 $ 100.00 $ 129,990.00 <br />18 SWPPP LS 1 $ 20,000.00 $ 20,000.00 <br />Trunk Line & Pavement Repair - Subtotal Construction: $ 1,243,730.00 <br />10% Contingency $ 124,373.00 <br />Trunk Line & Pavement Repair - Total Construction: $ 1,368,103.00 <br />Total Construction & EnClineerinCl (12%): $ 1,532,275.36 <br /> <br />Klotz Associates Project No. 0127.009.000 <br />August 2009 <br /> <br />Fairmon! Park East and Brookglen Drainage Study <br />City of La Porte <br />