My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
07-29-09 Drainage and Flooding Committee minutes
LaPorte
>
City Secretary
>
Minutes
>
Drainage and Flooding Committee
>
2009
>
07-29-09 Drainage and Flooding Committee minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2017 5:26:17 PM
Creation date
3/21/2025 2:28:17 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
Drainage and Flooding Committee
Meeting Doc Type
Minutes
Date
7/29/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Table 5 <br /> <br />Alternative-3 <br /> <br />Add a Parallel Storm Trunk under the Northbound Pavement of Fleetwood Drive <br />From HCFCD Unit 8106-02-00 (Outfall) to Spruce Dr. North <br />Remove and Replace Northbound Pavement (2,200 LF) <br /> <br />Item Item Description Unit Estimated Unit Price Total Cost <br />No. Quantity <br />1 Mobilize & Prepare Right-of-Way (5% ofTotal) LS 1 $ 50,000.00 $ 50,000.00 <br />2 Remove & Dispose of Existing Pavement SY 3,300 $ 3.10 $ 10,230.00 <br />3 Remove & Dispose of Existing Storm Pipe LF 155 $ 16.00 $ 2,480.00 <br />4 Excavation CY 2,981 $ 4.60 $ 13,720.00 <br />5 7" Reinforced Concrete Pavement (Include SY 3,300 $ 40.00 $ 132,000.00 <br />Subgrade) <br />6 Inlets Types A, B, C EA 28 $ 2,700 $ 75,600.00 <br />7 24" Reinforced Concrete Pipe LF 880 $ 50 $ 44,000.00 <br />8 5' x 5' Reinforced Concrete Box LF 548 $ 190.00 $ 104,120.00 <br />9 6' x 5' Reinforced Concrete Box LF 556 $ 200.00 $ 111,200.00 <br />10 7' x 5' Reinforced Concrete Box LF 581 $ 230.00 $ 133,630.00 <br />11 7' x 6' Reinforced Concrete Box LF 521 $ 260.00 $ 135,460.00 <br />12 8' x 6' Reinforced Concrete Box LF 217 $ 350.00 $ 75,950.00 <br />13 60" Equalizer Pipe Between Both Storm Trunks LF 120 $ 165.00 $ 19,800.00 <br />14 Junction Box EA 1 $ 10,000.00 $ 10,000.00 <br />15 Manholes EA 7 $ 3,000.00 $ 20,540.00 <br />16 Wingwall with Headwall EA 1 $ 25,000.00 $ 25,000.00 <br />17 5" Concrete Riprap SY 75 $ 42.00 $ 3,150.00 <br />18 Cement Stabilized Sand Ton 1,104 $ 100.00 $ 110,450.00 <br />19 Adjust & Grout Manholes EA 7 $ 1,000.00 $ 6,850.00 <br />20 SWPPP LS 1 $ 20,000.00 $ 20,000.00 <br />Trunk Line & Roadway. Subtotal Construction: $ 1,104,180.00 <br />10% Contingency $ 110,418.00 <br />Trunk Line & Roadwav - Total Construction: $ 1,214,598.00 <br />Total Construction & EnQineerinQ (12%): $ 1,360,349.76 <br /> <br />Klotz Associates Project No. 0127.009.000 <br />August 2009 <br /> <br />Fairmont Park East and Brookglen Drainage Study <br />City of La Porte <br />
The URL can be used to link to this page
Your browser does not support the video tag.