My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
07-29-09 Drainage and Flooding Committee minutes
LaPorte
>
City Secretary
>
Minutes
>
Drainage and Flooding Committee
>
2009
>
07-29-09 Drainage and Flooding Committee minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2017 5:26:17 PM
Creation date
3/21/2025 2:28:17 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
Drainage and Flooding Committee
Meeting Doc Type
Minutes
Date
7/29/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Table 6 <br />Alternative-4 <br /> <br />Removal and Replace Roadway with Lower Profile Grade Line for Fleetwood Drive <br />Replace Existing Storm Trunk Adjacent to Pavement <br />From HCFCD Unit 8106-02-00 (Outfall) to Sycamore Dr. South (2,400 LF) <br /> <br />Item Item Description Unit Estimated Unit Price Total Cost <br />No. Quantity <br />1 Mobilize & Prepare Right-of-Way (5% of Total) LS 1 $ 82,300.00 $ 82,300.00 <br />2 Remove & Dispose of Existing Pavement SY 12,000 $ 3.10 $ 37,200.00 <br />Full Width, Intersections & Crossing Streets <br />3 Remove & Dispose of Existing Storm Pipe LF 2,715 $ 16.00 $ 43,440.00 <br />4 Roadway Excavation CY 4,703 $ 4.60 $ 21,640.00 <br />5 Storm Excavation CY 1 ,496 $ 6.00 $ 8,980.00 <br />6 7" Reinforced Concrete Pavement SY 12,000 $ 40.00 $ 480,000.00 <br />(Include Subgrade) <br />7 Curb Ramps EA 30 $ 3,300.00 $ 99,000.00 <br />8 Inlets Types A, B, C EA 28 $ 2,700 $ 75,600.00 <br />9 24" Reinforced Concrete Pipe for Additional Curb LF 770 $ 50 $ 38,500.00 <br />Return Inlets <br />10 54" Reinforced Concrete Pipe LF 305 $ 140.00 $ 42,700.00 <br />11 60" Reinforced Concrete Pipe LF 238 $ 165.00 $ 39,270.00 <br />12 6' x 5' Reinforced Concrete Box LF 588 $ 200.00 $ 117,600.00 <br />13 8' x 5' Reinforced Concrete Box LF 570 $ 270.00 $ 153,900.00 <br />14 8' x 6' Reinforced Concrete Box LF 1,015 $ 350.00 $ 355,250.00 <br />15 Manholes EA 6 $ 3,000.00 $ 19,300.00 <br />16 Wingwall with Headwall EA 1 $ 25,000.00 $ 25,000.00 <br />17 5" Concrete Riprap SY 75 $ 42.00 $ 3,150.00 <br />18 Cement Stabilized Sand Ton 1,344 $ 100.00 $ 134,420.00 <br />19 SWPPP LS 1 $ 20,000.00 $ 20,000.00 <br />Trunk Line & Roadway - Subtotal Construction: $ 1,797,250.00 <br />10% Contingency $ 179,725.00 <br />Trunk Line & Roadwav - Total Construction: $ 1,976,975.00 <br />Total Construction & Enaineerina (12%): $ 2,214,212.00 <br /> <br />Klotz Associates Project No. 0127.009.000 <br />August 2009 <br /> <br />Fairmont Park East and Brookglen Drainage Study <br />City of La Porte <br />
The URL can be used to link to this page
Your browser does not support the video tag.