My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
08-19-09 Drainage and Flooding Committee Meeting minutes
LaPorte
>
City Secretary
>
Minutes
>
Drainage and Flooding Committee
>
2009
>
08-19-09 Drainage and Flooding Committee Meeting minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2017 5:26:17 PM
Creation date
3/21/2025 2:28:19 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
Drainage and Flooding Committee
Meeting Doc Type
Minutes
Date
8/19/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />drainage easement. Staff has also requested PHA to penetrate the sound wall with <br />culverts (wall foundation is substantial). Future work is included in the upcoming <br />CIP to redirect some storm water from this area to East Main, eventually <br />outfalling into Bob's Gully in Morgan's Point. <br /> <br />. Total draina!!e maintenance com Dieted in Au!!ust <br /> <br />. Cleaning of Ditches <br />. Hauling off Spoils <br />. Resetting culverts <br />. Inlet installation/repairs <br />. Culvert Maintenance/cleaning <br /> <br />500 LF <br />242 CY <br />1,322 LF <br />16 ea <br />850 LF <br /> <br />Routine maintenance of drainage systems throughout the city continues. These activities <br />include ongoing drainage maintenance activities to reestablish flow lines and cleaning <br />culverts, inspection and cleaning of existing underground storm sewer systems. <br />
The URL can be used to link to this page
Your browser does not support the video tag.