Laserfiche WebLink
Current Drainage Project Log <br /> Oakhurst outfit! <br /> Placement of approximately 1,000 feet of 6x4' CBG with related appurtenances for a direct outlet' to Galveston Bay. City forces along with assistance from Bt, cost Funding source Impacted Homes Date Completed <br /> TxDOT will redirect lows off of Broadway toward this new outlet', thereby reducing water levels impacting subdNlsions along Broadway. <br /> $650,000.00 CDBG 100 <br /> Design Implementation <br /> Construction Implementation <br /> Battlevkw <br /> Secure easements and construct a ditch to drain the area. Estimate is based an 5,200 Cy of excavation at 5.00/CV. plus incidentals. Est, Cost Funding Source Impacted tome Date Completed <br /> $ 40 00000 '.City C.O. rand <br /> Design Implementation <br /> Construction Implementation <br /> Port of Houston/ Pre - Check Fadlity ( B. Main Street) <br /> The City is planning to redirect the runoff currently being blocked from entering the Barbours Cut system. The proposed route is a direct path along Main Est, Cost Fmm rc <br /> rg Soue impeded Homes Date Completed <br /> Street to Bob's Gulley. <br /> $225,000.00 Cty C.0. Fund ':70 <br /> Design Implementation <br /> Construction Implementation <br /> F216 Reelopat Detention <br /> Excavation of approximately 250,000 cubic yards of material along both sides of tittle Cedar Bayou from Spencer Highway to Southbound SH 146 frontage Est Cost Funding Source Impacted tomes Date Completed <br /> road. Two control structures are proposed that will provide the detention component Of the $2.5M estimated cost $1.1M Is available in the GEN 849 - - - - -- --- - -- - - -- -- - - - - - -- - -- - - -- ------ - - - - -- <br /> Fund $2.5 million ;City Prior Bond '.450 <br /> Design Implementation <br /> Construction Implementation <br /> BrookBlen Phase I (Street flow) <br /> Construction of nine (9i sheet flow paths which will allow the extreme 100 -year event loo discharge into a preferred outran. These structures will also Est Cost Funding source. Impacted Homes Date Completed <br /> control the water level in the street, thereby keeping the extreme rain event out of homes. Estimate amount shown B the total cost of all sheet flow <br /> paths currently designed distributed equally. $175,000 Clty C.O. Fund 600 <br /> Design Implementation <br /> Construction implementation <br /> Faineant Park West (Sheet Row) <br /> Construction of five (5) sheet flow paths which will allow the extreme 100 -year event to discharge into a preferred outfall. These structures wit also Est, cost RrxaM Source Impacted Homes ::Date Completed <br /> control the water level in the street, thereby keeping the extreme rain event out of homes. Estimate amount shown is the total cost of all sheet flow <br /> paths currently designed distributed equally. <br /> $175,000 .City C.O. Fund 390 <br /> Design Implementation <br /> Construction Implementation <br /> Creekmont:Sect I (Sheet flow) <br /> Construction of one (1) sheet flow paths which will allow the extreme 100 -year event to discharge into a preferred outfall. These structures will also Est cost Funding Source Impacted Homes Date Completed <br /> control the water Level in the street, thereby keeping the extreme rain event out of homes. Estimate amount shown is the total cost of all sheet flow City C 0 Fund 110 <br /> paths currently designed distributed equally. 9175,000 - <br /> Design Implementation <br /> Construction Implementation <br /> Updated 02/15/11 <br />