My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
11-01-10 Drainage and Flooding Committee
LaPorte
>
City Secretary
>
Minutes
>
Drainage and Flooding Committee
>
2010
>
11-01-10 Drainage and Flooding Committee
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2017 5:26:17 PM
Creation date
3/21/2025 2:28:23 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
Drainage and Flooding Committee
Meeting Doc Type
Minutes
Date
11/1/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Current Projects <br /> Fairmont Park E (Sheet Hove) <br /> Construction of three (3) sheet flow paths which will allow the extreme 100-year event to discharge Into a preferred outfail. These structures will also Est Esc Funding source Impact Homes Date Completed <br /> i control the water level in the street, thereby keeping the extreme rain event out of homes. Estimate amount shown Is the total cost of of sheet flow _ . _._... , - _.......... <br /> paths currently designed dlstrhbuted equally. $175,000 ;City CO Fund 500 <br /> -Design Implementation <br /> Consttucion Implementation <br /> Erookglen Detention <br /> The City will construct three (4) detention ponds in proximity to Brookglen subdivision in order to lower the existing 100 -year WSEL Impacting structures. Est Cost Funding Source Impacted Homes Date Completed <br /> Two ponds included in estimate of cost on this line item, one is induded in a current De- silting Project and one being delayed for a future project. 5700,000 Cey CO Fund <br /> Design Implementation <br /> Construction Implementation <br /> Fleetwood Lowering <br /> Cty will lower and re -grade Fleetwood Drive in order to allow side streets to convey extreme rain events via surface flow. Currently Heetwood Drive acts Est. Cost Funding Source Impacted Homes Date Completed <br /> as a dam, impeding surface conveyance and creating a bowl effect 2.0 Mil City C O Fund <br /> Design Implementation <br /> Construction Implementation <br /> De- silting Ditdnes <br /> De- silting, resetting culverts, and construction of concrete flumes in channel bottom in HCFCD Channels B109 -03-00 (Spenwldc Subdivision), 8106 -05 <br /> (LOMA)(), South 3rd Street, and Arizona St. Project will be funded by various City funds including 5173,000 from the Certificate of Obligation Fund, Est Cost Funding Source impacted Homes Date Completed <br /> $418,00 from the GEN 957 Fund, and $100,000 from the Drainage Maintenance Fund. <br /> 5173.00000 �Various -- _ — _ <br /> Design Implementation <br /> Construction Implementation <br /> Sunrise and Sraadwsq <br /> Construction of sheet flow path at two locations to allow the 100 year event to discharge into Galveston Bay. Est Cost _ _ funds g Source ; Impacted Homes Date Completed <br /> $89,000 u City COFund <br /> Design Implementation <br /> Construction Implementation <br /> South 16th Street <br /> Drainage Improvements to redirect flows from Main Street to 0 and F StreetDrainage Improvements to redirect flows from Main Street to D and F Street Est Cost Funding Source impacted Homes Date Completed __. <br /> S87,000 City C.0 Fund <br /> Design Implementation <br /> Construction Implementation <br /> Total Estimated Certificate of Obligation Funds for Current Projects $2,014,000 <br /> Updated 02/15/11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.