My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
02-28-11 Drainage and Flooding Committee minutes
LaPorte
>
City Secretary
>
Minutes
>
Drainage and Flooding Committee
>
2011
>
02-28-11 Drainage and Flooding Committee minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2017 5:26:17 PM
Creation date
3/21/2025 2:28:26 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
Drainage and Flooding Committee
Meeting Doc Type
Minutes
Date
2/28/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
klotz451associates <br /> Re- analysis of Drainage Impacts to B106 -02 -00 and B106 -00 -00 <br /> August 30, 2010 <br /> Page 2 of 2 <br /> Stream B106-02-00, which is unstudied, was divided into an upstream reach and a downstream <br /> reach for flood routing. The dividing point between the reaches is Old Hickory Drive. In order <br /> to define storage - discharge relationships for these reaches, an HEC -RAS model was developed <br /> using geometry from LiDAR data. As -built drawings dated February 2, 1982, entitled "Fairmont <br /> Park East — Section One," prepared by Gulf Coast Engineering & Surveying were used to define <br /> bridge geometry at Old Hickory Drive (and adjacent Humble Pipeline) and the channel geometry <br /> upstream from that point. The resulting storage - discharge relationships were used for Modified <br /> Pul's routing in HEC -HMS. <br /> Results and Conclusion <br /> Table 1 shows a comparison of computed flows between pre- and post - project conditions for the <br /> 1% storm event. This table shows for 13106 -00 -00 there is no impact on flows between the <br /> confluence with B106-02-00 at Junction 2 and the confluence with Armand Bayou (B100- 00 -00) <br /> at Node b100 #7d. However, for B106-02 -00 there is an increase in computed flows at Old <br /> Hickory Drive. The 1% -event hydrographs for pre - and post - project conditions are shown for <br /> these locations on Exhibits 3a thru 3f. <br /> Table 2 shows the same comparison for the 10% storm event. This table shows for B106 -00 -00 <br /> there is no impact on flows between the confluence with B106 -02 -00 at Junction 2 and the <br /> confluence with B 100 -00 -00 at Node b 100 #7d. <br /> In conclusion, our re- analysis of impacts for the proposed drainage improvements shows no <br /> impacts on flows for the 10% and 1% storm events within B 106- 00 -00. Therefore, for B106-00- <br /> 00 the proposed project will cause no impact for events up to and including the 100 -year (1 %) <br /> event. <br />
The URL can be used to link to this page
Your browser does not support the video tag.