My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
12-05-11 Drainage and Flooding Committee Meeting
LaPorte
>
City Secretary
>
Minutes
>
Drainage and Flooding Committee
>
2011
>
12-05-11 Drainage and Flooding Committee Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2022 8:44:42 AM
Creation date
3/21/2025 2:28:30 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
Drainage and Flooding Committee
Meeting Doc Type
Minutes
Date
12/5/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Planning Director, Tim Tietjens added the F101 Project was being affected by pipeline corridors and requested solutions <br />to resolve current issues. <br />Haskel Rogers with ExxonMobil advised ExxonMobil owned the majority of the pipelines in the areas of concern. Mr. <br />Rogers advised the committee, when new pipelines are constructed across flood control ditches or rivers, ExxonMobil <br />verifies with the governing authorities and construct pipelines to accommodate current and future plans. Mr. Rogers <br />informed pipelines inside F101 date back to the 1930's and understands there is an issue with flood control and <br />ExxonMobil is willing to work with the city to resolve concerns. <br />Mr. Rogers requested clarification of the cause of flooding along the pipelines corridors from the committee. Chairman <br />Mosteit responded committee members were informed ditches could not be excavated low enough to continue drainage <br />flow downhill. Mr. Rogers informed a City of La Porte drawing had been received showing ten general areas of drainage <br />concerns. Mr. Rogers advised drawings with specific detailed plans are required from the city to determine if the areas of <br />concerns have pipelines involved. Mr. Rogers informed pipelines that are required to be taken out of service have a <br />process and efforts would have to be coordinated between the city and ExxonMobil. <br />Chairman Mosteit directed staff to meet and work with ExxonMobil to resolve areas of concern regarding <br />pipeline/drainage conflicts and to notifying at least one committee member to also attend future meetings with the Texas <br />Energy Coalition and/or its membership. <br />4. Set date for next Drainage and Flooding Committee Meeting <br />Chairman Mosteit set the next Drainage and Flooding Committee Meeting for January 16, 2012 at 5:00 p.m. <br />5. Committee Comments <br />Chairman Mosteit, Committee member Engelken and Alternate member Leonard thanked the Texas Energy Coalition or <br />its membership for attending the meeting and explaining the processes for working with the city to resolve drainage <br />conflicts. <br />6. Executive Session <br />There was no executive session. <br />7. Adjourn <br />There being no further business, Alternate Member Leonard moved to adjourn the meeting. Committee Member <br />Engelken seconded. Motion Passed. <br />Meeting was adjourned at 5: 43 p.m. <br />Re p cttully submitted <br />haron Harris, Assistant City Secretary <br />Passed and approved on this 16th day of January 2012. <br />1, <br />Chairman Mike Mosteit <br />Page 2 of 2 <br />December 5, 2011, Drainage and Flooding Committee Minutes <br />
The URL can be used to link to this page
Your browser does not support the video tag.