Laserfiche WebLink
klotz ,Jassociates <br />Mr. Ron Bottoms <br />January 18, 2008 <br />Page 9 of 13 <br />Little Cedar Bayou, 2) flooding along B 106-00-00, 3) flooding along B 112-00-00 3) flooding <br />along F101-00-00 and 4) flooding issues along the Taylor Bayou watershed; changes in this list <br />may be made as part of this task. <br />Identify Conceptual Options: For each of the problems to be addressed (as determined in the <br />preceding activity), identify at least two but no more than three conceptual solution options. <br />Options could include physical options such as regional detention, channel widening, and <br />constriction removal; and/or institutional options such as changes in drainage design criteria or <br />property acquisition. Options could incorporate potentials for multi -uses for community amenity <br />purposes. Document the options in terms of general characteristics, preliminary costs, and <br />physical and institutional feasibility. The results of the evaluations will be informally presented <br />to the City for their review and consideration. Evaluation of effectiveness of a conceptual <br />solution will utilize hydrologic and/or hydraulic modeling as may be judged necessary by the <br />Consultant. <br />Recommended Solutions: Based upon evaluation of the selected conceptual options identified <br />discussed in consultation with the City, recommendations for drainage facilities and <br />infrastructure will be made. <br />Task 4.3 Products: <br />List of prioritized problems for which conceptual solutions are to be developed. <br />List and summary description of options considered. <br />• Tabulation of option costs and implementation issues. <br />Summary of evaluation results of options. <br />Recommendations for drainage facilities and infrastructure. <br />Task 4.4 Identify Funding Sources <br />Task Purpose: Identify funding sources that are available including grants, low interest rate <br />loans, and other sources such as City funding, funding from Harris County Flood Control, <br />funding from Harris County or funding from others. Document results of identified funding <br />sources. <br />Prepare Document. Prepare a document to be included in the report that documents the results <br />of the identification of funding sources. <br />A draft letter report (Report #3) for the completion of the some of the elements of Phase 4 <br />including Tasks 4.1 through Tasks 4.4 will be submitted to the City for review within 90 days <br />after approval of Report #2. <br />