My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
City-Wide Drainage Study Revised Scope of Services 01-28-08
LaPorte
>
City Secretary
>
Minutes
>
Drainage and Flooding Committee
>
Drainage and Flooding Reports
>
City-Wide Drainage Study Revised Scope of Services 01-28-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2022 8:45:46 AM
Creation date
3/21/2025 2:28:58 PM
Metadata
Fields
Template:
La Porte TX
Document Type
Reports and Studies
Date
1/28/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
k10tz4(1associates <br />Mr. Ron Bottoms <br />January 18, 2008 <br />Page 8 of 13 <br />Task 4.1: Define Standards and Criteria Needed for Development of CWDS <br />Make review of and Identify Criteria. Review criteria and standards used in the City, Harris <br />County, and adjacent communities to provide an overview of criteria and standards which could <br />be used in defining basic features for CWDS projects and improvements. Select key criteria for <br />use in developing actual plan. <br />Task 4.1 Products: <br />List with summary descriptions of key criteria and/or standards to be used in developing <br />conceptual solutions to the City drainage and flood control problems. <br />Task 4.2 Prioritize Drainage and Flood Control Problems <br />Identify Parameters for Prioritization. Identify potential parameters and procedures to prioritize <br />problems for resolution. Describe how the parameters are to be used to determine prioritization. <br />Meet with City to describe and refine parameters to utilize. <br />Prioritize Problems for Resolution. Apply parameters to potential drainage and flooding <br />problems to develop a recommended prioritization of current and future problems for which <br />conceptual solutions are to be developed. The conceptual solutions will include short-term <br />solutions for immediate items and then long-term solutions. Incorporate citizen input obtained in <br />meeting into prioritization. <br />Refine Prioritization. Hold meeting with City Council to review prioritization and make final <br />determination of priority drainage and flooding problems. <br />Task 4.2 Products: <br />• List of preferred parameters for defining priority of problems. <br />• Description of prioritization method. <br />Prioritized list of drainage and flooding problems for short-term solutions and for long- <br />term solutions. <br />Task 4.3 Develop Conceptual Solutions to High Priority Problems <br />Define High Priority Problems. In consultation with the City, select a set of the prioritized <br />problems identified Phase 2. Short-term solutions have been proposed as Task 2.3. Develop <br />long-term solutions that would include at least 4 primary problems but no more than 5 primary <br />,. problems. It is anticipated that the selected subset will include the following: 1) flooding along <br />
The URL can be used to link to this page
Your browser does not support the video tag.