City-Wide Drainage Study Revised Scope of Services 01-28-08
LaPorte
>
City Secretary
>
Minutes
>
Drainage and Flooding Committee
>
Drainage and Flooding Reports
>
City-Wide Drainage Study Revised Scope of Services 01-28-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2022 8:45:46 AM
Creation date
3/21/2025 2:28:58 PM
Metadata
Fields
Template:
La Porte TX
Document Type
Reports and Studies
Date
1/28/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
kiotz0/1associates <br />Mr. Ron Bottoms <br />January 18, 2008 <br />Page 7 of 13 <br />recognizing the planning level character of the intended use of the collected data. Describe <br />and/or determine the format in which survey information is to be provided, and associated <br />potential documentation of survey activities and location. Describe and/or determine procedures <br />for checking of data. <br />Task 2.6 Products: <br />Scope of work for Field Surveyor Sub -consultant. <br />Task 2.7 Project Management of Phase 2 <br />Provide administrative and management activities necessary for successful and orderly execution <br />of project work for this phase; report upon work progress to the City; and guide and focus project <br />activities to achieve project objectives. Weekly project status reports will be emailed to the City <br />and monthly invoices will include status reports. <br />PHASE 3: CONDUCT FIELD SURVEY IN SUPPORT OF PHASE 2 <br />The purpose of this phase is to obtain field data important to describing hydraulic conditions to <br />be evaluated as part of Phase 2. <br />Task 3.1 Perform Field Survey <br />Perform Field Survey. Select field surveyor and conduct field survey in accord with scope <br />defined in Phase 2. Collected data are to be input to electronic files and checked for validity. <br />Map Documentation. The detail survey work shall be also described in an overview map <br />showing watercourse surveyed extent of survey, structures surveyed, and location of surveyed <br />cross sections along waterways and conveyances. <br />Task 3.1 Products: <br />• Electronic data files of field survey data. <br />• Map summarizing field survey data collection. <br />PHASE 4 DEVELOP CITY-WIDE DRAINAGE STUDY <br />The purpose of this phase is to use the evaluation of existing and proposed drainage and flooding <br />problems developed in prior phases to identify, describe and prioritize conceptual solutions for <br />resolving such problems. <br />