My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
City-Wide Drainage Study Revised Scope of Services 01-28-08
LaPorte
>
City Secretary
>
Minutes
>
Drainage and Flooding Committee
>
Drainage and Flooding Reports
>
City-Wide Drainage Study Revised Scope of Services 01-28-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2022 8:45:46 AM
Creation date
3/21/2025 2:28:58 PM
Metadata
Fields
Template:
La Porte TX
Document Type
Reports and Studies
Date
1/28/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
kIotz111associates <br />Mr. Ron Bottoms <br />January 18, 2008 <br />Page 11 of 13 <br />Make Formal Presentation of CWDS. At a time and place specified by the City, Klotz <br />Associates will make a public presentation of the key findings and recommendations of the <br />CWDS report to the City. Development of the details of the presentation will be made in <br />consultation with the Director of Public Works, City Manager and City Engineer. <br />Task 4.5 Products: <br />• Draft CWDS Report Outline <br />• Draft Report (5 copies) <br />• Final Report (5 copies) <br />• Presentation of CWDS to City. (1 verbal presentation) <br />Task 4.6: Project Management of Phase 4 <br />Provide administrative and management activities necessary for successful and orderly execution <br />of project work for this phase; report upon work to the City; and guide and focus project <br />activities to achieve project objectives. Weekly project status reports will be emailed to the City <br />and monthly invoices will include status reports. <br />PHASE 5 OTHER ITEMS <br />Task 5.1: Review Design of the F216-00-00 Designed Detention Basin <br />Make review of and recommend refinement or changes to detention basin. Review the F216-00- <br />00 designed detention basin. Recommend applicable changes or refinement to the basin design. <br />Review possible phasing of the detention basin. <br />Task 5.1 Products: <br />Letter documenting the review of the detention basin design along, recommendations on <br />changes or refinements to the design and possible phasing of the construction of the <br />basin. This review is to be conducted within 60 days from notice to proceed. <br />TERMS <br />We propose to perform the engineering services described above on a lump sum basis except for <br />the surveying that will be subcontracted and costs will be determined at that time. We have <br />estimated the surveying fees and listed below under additional services. <br />
The URL can be used to link to this page
Your browser does not support the video tag.