My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
City-Wide Drainage Study Revised Scope of Services 01-28-08
LaPorte
>
City Secretary
>
Minutes
>
Drainage and Flooding Committee
>
Drainage and Flooding Reports
>
City-Wide Drainage Study Revised Scope of Services 01-28-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2022 8:45:46 AM
Creation date
3/21/2025 2:28:58 PM
Metadata
Fields
Template:
La Porte TX
Document Type
Reports and Studies
Date
1/28/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
k I o t z 4,,11 a s s o c i a t e s <br />Mr. Ron Bottoms <br />January 18, 2008 <br />Page 12 of 13 <br />FEES <br />The following costs are not -to -exceed amounts for each Task. <br />Basic Services <br />Phase 1 <br />Assessment of Drainage and Flooding Problems <br />$20,890.00 <br />Phase 2 <br />Drainage and Flooding Problem Detailing <br />$33,825.00 <br />Phase 3 <br />Field Survey not part of basic fees (see Additional <br />Services <br />$ 0.00 <br />Phase 4 <br />Phase 5 <br />Expenses <br />Develop City -Wide Drainage Study <br />Review F216 Detention Basin Design <br />Report Printing and Misc. Expenses <br />$50,185.00 <br />$3,960.00 <br />$4,350.00 <br />TOTAL <br />$113,210.00 <br />Additional Services <br />Survey will be needed, but the scope of the survey will not be known until Phase 1 — Assessment <br />of drainage and flooding problems is complete. The scope of the survey will be defined in Phase <br />2 — Drainage and flooding problem detailing. Until that scope is determined, the fee for that task <br />is not set. <br />However, we estimate that the field survey costs will not exceed $20,000.00, and we recommend <br />that funds be initially set aside for this amount. This amount is included in the contract amount, <br />and it will not be authorized until written approval for the survey is provided by the City. <br />sr.HFnr1i.F <br />Upon receiving notice to proceed, the pre -final submittal will be completed to present to the City <br />in accordance with the time schedules are listed in this scope of work. See Tasks 1.7, 2.3, 4.4, <br />4.5 and 5.1. The schedules listed are consistent with the original City request. <br />
The URL can be used to link to this page
Your browser does not support the video tag.