My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
City-Wide Drainage Study Revised Scope of Services 01-28-08
LaPorte
>
City Secretary
>
Minutes
>
Drainage and Flooding Committee
>
Drainage and Flooding Reports
>
City-Wide Drainage Study Revised Scope of Services 01-28-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2022 8:45:46 AM
Creation date
3/21/2025 2:28:58 PM
Metadata
Fields
Template:
La Porte TX
Document Type
Reports and Studies
Date
1/28/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
klotz JF./1associates <br />Mr. Ron Bottoms <br />January 18, 2008 <br />Page 3 of 13 <br />• Description of City watershed and surface drainage system. <br />• Maps of currently defined floodplains. <br />• Digital data such as channel sections, profiles and topography from various sources. <br />• Listing of collected documents. <br />• Important photos of field conditions. <br />• Identify ownership and maintenance responsibilities for major channels. <br />• Review existing city policies and standards and recommend changes. <br />• Perform assessment of the current drainage and flood control conditions and issues using <br />the collected available data. <br />Task 1.5 Assessment of Existing and Anticipated Problems <br />Review collected information. Identify and describe the key drainage and flood problem <br />characteristics that can be deduced from collected information. <br />Task 1.6 Document Data Collected <br />Document the collected data including the characteristics of existing and anticipated problem <br />areas. <br />Task 1.7 Project Management of Phase 1 <br />Provide administrative and management activities necessary for successful and orderly execution <br />of project work for this phase; report upon work progress to the City; and guide and focus project <br />activities to achieve project objectives. Weekly project status reports will be emailed to the City <br />and monthly invoices will include status reports. <br />Task 1.7 Products: <br />A draft letter report (Report #1) for the completion of the elements of Phase 1 including Tasks <br />1.1 through Tasks 1.7 will be submitted to the City for review within 30 days from notice to <br />proceed. <br />PHASE 2: DRAINAGE AND FLOODING PROBLEM DETAILING <br />The purpose of this phase is provide a quantitatively based description of existing and anticipated <br />drainage and flooding problems selected for detailed focus in Phase 1 and to propose short-term <br />solutions to problems. <br />
The URL can be used to link to this page
Your browser does not support the video tag.