Laserfiche WebLink
'~ ~ • • <br />• <br />A. <br />NOTES <br />GOLF COURSE ADUISORY BOARD MEETING <br />NOVEMBER 18, 1987 <br />CONSTRUCTION CONTRACT OF LA PORTE'S BAY FOREST GOLF COURSE <br />CARTER CONSTRUCTION COMPANY <br />Construction of an eighteen (18) hole golf course complete with a putting <br />green, a chipping green, and a driving range. The contract also calls for <br />the construction of lakes to hold treated water for the irrigation of the <br />facility <br />PERGENT <br />COMPLETE <br />Greens 100% <br />Include eighteen (18) greens, one putting green and <br />one chipping green <br />Fairways 100% <br />• Driving Range 100% <br />Cart paths - (6 foot wide paths) 98% -_.. <br />Grass 75% <br />Greens ( holes 3-8 left) <br />Fairways (3 - 8 left) <br />Irrigation (replacement of control box lift) 99.5% <br />B. EFFLUENT LINE <br />Allgood Construction Company <br />Construction of a line running from the sewage treatment plant to the <br />holding lakes on the golf course <br />PERCENT <br />COMPLETE <br />Effluent line 100% <br />C. TUNNEL <br />Allgood Construction Company <br />Construction of a tunnel under Wharton-Weems Road to connect the two parts <br />of the golf course <br />PERCENT <br />COMPLETE <br />Tynnel (lacking flexible base and asphalt 94% <br />