Laserfiche WebLink
<br /> <br />J <br />~f' <br />} <br /> <br />Cost of 6.0 mgd Water Plant at La Porte <br /> <br />Plant Cost <br />6.0 mgd @ $.80 = <br />Finished Water Pump Station <br />Storage Facilities <br />Yard Piping <br />Site Work <br /> <br />Subtotal Plant <br /> <br />other Costs <br />Land Cost <br />Raw Water Pump Station Lynchburg <br />Construction and Engineering <br />Raw Waterline (CWA) <br />Treated Water Transmission Line <br />Engineering Costs - Plant <br />Prel. & Design <br />Surveys <br />Soils Investigation <br />Construction Phase Basic <br />Inspection Services <br />Testing <br />Sub~otal Engineering Cost <br />Prel~ & Design <br />Surveys <br />Soils Investigation <br />Construction Phase - Basic <br />Construction Phase Inspection <br />Testing <br /> <br />Subtotal Engineering Cost <br />Engineering Cost - Treated <br />Waterline <br />Prel. & Design <br />Surveys <br />Soil Investigation <br />Construction -- Basic <br />Inspection Services <br />Testing <br />Subtotal Engineering Cost <br /> <br />Subtotal Other <br /> <br />Total Cost <br /> <br />$4,800,000 <br />350,000 <br />300,000 <br />200,000 <br />150,000 <br /> <br />310,000 <br />10,000 <br />30,000 <br />77,000 <br />200,000 <br />30,000 <br /> <br />27,000 <br />6,000 <br />3,000 <br />7,000 <br />40,000 <br />3,000 <br /> <br />97,000 <br />30,000 <br />8,000 <br />24,000 <br />95,000 <br />7~000 <br /> <br />Exhibit "B" <br /> <br />,~~ <br />~~ <br />A'" <br />V~ <br /> <br />$5,800,000 <br /> <br />$ 200,000 <br /> <br />293,000 <br />500,000 <br />2,117,000 <br /> <br />657,000 <br /> <br />86,000 <br /> <br />261,000 <br />$4,114,000 <br /> <br />$9,914,000 <br />