My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
09-17-86 Meeting of the La Porte Area Water Authority Minutes
LaPorte
>
City Secretary
>
Minutes
>
La Porte Area Water Authority Board
>
1980's
>
1986
>
09-17-86 Meeting of the La Porte Area Water Authority Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2017 3:00:49 PM
Creation date
3/21/2025 2:41:49 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
La Porte Area Water Authority Board
Meeting Doc Type
Minutes
Date
9/17/1986
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />KL01Z / h. 'jCIh.TES, INC. <br /> <br />Consulting Enginee, <br /> <br />ELEVATED STORAGE (City of Deer Park) <br /> <br />At present, three elevated storage tanks exist in the city <br /> <br />system. They include a 0.5 MG tank at the Pasadena plant site, a <br /> <br />0.5 MG tank at the Coy/Durant plant site, and a 0.5 MG tank <br /> <br />located on 8th Street in the northwest corner of the city. The <br /> <br />low water, level and mid-depth level for each of the three tanks <br /> <br />is estimated to be 143.0 and 154.0 respectively (U.S.G.S. Mean <br /> <br />Sea Level elevation) for the purpose of this study. <br /> <br />PROPOSED FACILITIES <br /> <br />This study provides estimated cost for treatment facilities <br /> <br />required to treat 4 MGD and 10 MGD with necessary appurtenances. <br /> <br />Deer Park. <br /> <br />The City of Deer Park current demand for treated <br /> <br />surface water is assumed to be 4 MGD. Existing wells with <br /> <br />storage facilities are to be used for water requirements <br /> <br />beyond 4 MGD surface production and proposed 2 MG ground <br /> <br />storage. Existing ground water sources are to be eventually <br /> <br />retired. <br /> <br />Site requirements included in this study provide for an <br /> <br />ultimate production requirement of 12 MGD (after retirement <br /> <br />of wells) and 6 MG ground storage. <br />
The URL can be used to link to this page
Your browser does not support the video tag.