Laserfiche WebLink
• <br />LA PORTE AREA WATER AUTHORITY <br />MONTHLY REPORT <br />JUNE, 1988 <br />ENGINEER"S REPORT: <br />Design: Completed 98% of final design. Currently working on <br />design of lateral lines along Big Island Slough and on Bay Area <br />Blvd. ROW. Aerial flight of Big Island Slough and Bay Area Blvd. <br />routes has been completed. Aerial firm will send requirements for <br />ground survey to complete survey. Espey-Huston will complete <br />design for these sections from the final aerials. <br />Plans and Specifications are ready for Board review and comment at <br />this time. Staff has reviewed plans and specifications on an <br />ongoing basis. <br />Engineer has a cost comparison between ductile iron pipe and pvc <br />pipe available at this time and it will be distributed and <br />discussed at this meeting. <br />Engineer has prepared a contractors" prequalification package. It <br />will be distributed and discussed at this meeting. <br />STAFF REPORT: <br />Right-of-way Acquisition: <br />Coastal Water Authority-Currently negotiating with CWA <br />through City of Houston Real Estate Division for cost of use <br />of CWA right-of-way. Brown and Root Engineers currently <br />reviewing survey for CWA. CWA Board has approved the use of <br />the requested right-of-way. <br />PPG (Bay Area Blvd. ROW)-The City of La Porte received a <br />letter from PPG on July 7, 1988 informing us that they are <br />happy to work with the City of La Porte and provide the <br />necessary road right-of-way and separate ten (10) foot <br />utility easement to the City of La Porte at no charge. The <br />letter requests certain considerations which will be <br />addressed later by the City of La Porte. Verbally the Area <br />Plant Manager, Mr. Henry Ramirez, has assured us that they <br />will work with the Authority to procure the ten (10) foot <br />easement, if necessary, before solving the other matters <br />concerning the road right-of-way. <br />