! • <br />Page Two <br />Minutes <br />May 9, 1989 <br />5. Steve Gillett reported the payment that has been requested by the <br />City of Houston is still under budget on total project cost and <br />catch-up. He stated he had toured the Southeast Water <br />Purification Plant again reporting there are eleven (11) <br />participants in the plant. Mr. Gillett stated he had met with the <br />City of Houston"s operational side. He reported they are more <br />concerned with the distribution system as it relates to the other <br />customers excluding La Porte. Mr. Gillett said he felt very good <br />that the La Porte Area Water Authority had its own distribution <br />system. Mr. Gillett reported the City of Houston had indicated <br />some time schedules that included August 27, 1g8g as the tentative <br />thirty (30) day test of the plant and completion being sometime in <br />November/December. The City of Houston reported the ninety-six <br />(96) inch waterline is almost complete allowing the Authority to <br />construct our line in the CWA ROW. <br />Mr. Gillett stated the Internal Transmission Line has some <br />updates. Dale Conger has reviewed the plans from Turner, Collie & <br />Braden, Inc. and Mr. Gillett has received a letter from the Health <br />Department stating they approved those plans noting completion is <br />scheduled for sometime in October. <br />Motion was made to approve payment of the invoice from the City of <br />Houston in the amount of two hundred twenty three thousand nine <br />hundred seventy-four dollars and fifty-nine cents ($223,974.59) by <br />Vice President Richard Matthews and seconded by Member Michael <br />Wadsworth. Motion was unanimous. <br />6. Project Representative Robert Ray reported on the progress of the <br />water line. <br />Dale Conger of Espey, Huston & Associates, Inc. reported the <br />contractor had been unable to start construction at the <br />Shoreacres" site due to a telephone cable having been installed in <br />the ROW area near the intended location of the water line. He <br />stated they had obtained permission from the Highway Department to <br />move the line further out into the ROW. Mr. Conger advised the <br />Board there is a provision in the permit that, in the event the <br />Highway Department decides to build a road in that ROW, the <br />Authority would be liable to relocate the water line. Mr. Conger <br />said they are looking at moving the water line location site to a <br />now abandoned sanitary sewer line. He stated they are still <br />dealing with the contractor on this matter. <br />