Laserfiche WebLink
~, <br />Page Two <br />Minutes-LPAWA <br />January 9, 1989 <br />6. Dale Conger reported most of the construction is complete. <br />There are several leaks Mercer is repairing. He stated that <br />there is a lot of clean-up left to do. Mr. Conger reported <br />when construction was complete, it appears the Authority <br />will have spent 3.2 million with Mercer with the original <br />contract being 3.5 million, about 10 per cent under in the <br />construction phase. He stated that this has been a smooth <br />operation for the size with no major public relations <br />problems. The CWA ROW problems with Brown & Root were <br />discussed. <br />7. General Manager Bob Herrera reported that he had received <br />correspondence from Morgan's Point stating their tank would <br />be finished quickly. <br />8. President Jerry Bramlett had no report at this time. <br />9. There being no further business, Member Mike Wadsworth made <br />motion to adjourn, seconded by Secretary Claude Graves. <br />Motion was unanimous and the meeting was adjourned at 6:37 <br />P.M. <br />~~~. ter.-z-- <br />Claude Graves, Secretary, Treasurer <br />PASSED AND APPROVE//D: Q /~ <br />ON THIS DAY ~Q-!~ ~ 3 , 19 v~ <br />Jerr tt, President <br />.L- <br />