My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
09-10-08 Special Called Regular Meeting of the Development Corporation Board of Directors
LaPorte
>
City Secretary
>
Minutes
>
La Porte Development Corporation/Type B
>
2000's
>
2008
>
09-10-08 Special Called Regular Meeting of the Development Corporation Board of Directors
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2017 3:22:25 PM
Creation date
3/21/2025 2:44:07 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
La Porte Development Board Corporation/Type B
Meeting Doc Type
Minutes
Date
9/10/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />URS <br /> <br />. Hardscape which will include side walks, plaza pavers, curbs, and drivable <br />areas for delivery vehicles. An area for a prominent piece public art will be <br />included (public art is not included.) Hardscape will also include street lights, <br />signage, and ornamental fencing. <br /> <br />. Facilities to be part of this effort include the Gazebo and 2 entrance gates <br />/archways. <br /> <br />. Water Feature to include at least one major water feature and possible a <br />smaller one as indicated on the video. <br /> <br />. Cost estimates for the project from initial concept through final design. <br /> <br />The design and construction will be completed with LEED criteria in mind. We want to <br />provide and exciting venue for the public gatherings and also encourage and support <br />the redevelopment (by private developers) of the Five Points area. Knowledge of the <br />existing surface, and sub surface infrastructure will need to be fully understood early <br />in this process. <br /> <br />Phase One 300/0 Desian <br /> <br />Project Initiation / Visioning - This phase shall incorporate the project kick-off, to <br />include an overall site tour, as well as a visioning work session to identify project <br />goals and priorities. <br /> <br />Key tasks associated with this phase include: <br />. Establishment of a working group consisting of key representatives from the <br />City of LaPorte, and may include other east Harris County leadership, for <br />review and approval of planning options. <br />· To provide a forum for communication and consensus-building, a one day <br />visioning retreat will be held with key staff. to confirm the planning process, <br />priorities, timeline, project objectives and anticipated project outcomes. <br />· Orientation site tour(s) to understand existing site, architectural, engineering <br />and functional conditions. <br /> <br />Data Gathering - This phase shall involve the gathering of data including information <br />related to documents available from LaPorte, Harris County, Center Point data etc. <br />and existing surveys, plans, drawings and studies. <br /> <br />Key tasks involved include: <br />· Gathering of information related to surveys and land plats, historical utilization, <br />zoning information, environmental etc. <br />. Gathering of information related to the physical facilities, including architectural <br />and engineering drawings, master planning studies, etc. <br />· Current above grade utility plans including water meters, hydrants, waste water, <br />electrical (power poles overhead lines, telephone (communication pOles or <br />structures, fiber optic stations, natural gas meters. <br /> <br />URS Corporation <br />9801 Westheimer,Suite 101 <br />Houston,Texas 77042 <br />Tel: 713789-9801 <br />Fax: 713 789 8404 <br />
The URL can be used to link to this page
Your browser does not support the video tag.