Laserfiche WebLink
<br />URS <br /> <br />Docu mentation <br />. Landscape Plan Concept <br />. Hardscape Plan Concept <br />. Water Feature Plan Concept <br />. Architectural Facilities Plan Concepts <br />. Concept Cost estimate <br />. Professional Services scope schedule and budget update <br /> <br /> <br />Phase One A Infrastructure Study Analysis Phase <br /> <br />Concurrent to design Phase services- A high level overview of the cities' existing <br />infrastructure systems will be conducted to identify current conditions and capacities <br />to support any additions or renovations proposed by the five points development <br />plan and other proposed adjacent development as of the date of this proposal. <br /> <br />Key tasks involved include: <br />. The Engineer will collect information on all existing utilities from municipal, <br />private and industrial sources. <br />. The Engineer will also obtain existing statistical information about water flows <br />and demands, wastewater flows and storm water flows. <br />. The capacities of the existing system will be estimated and compared to the <br />existing flows for adequacy determinations. <br />. Future flow projections will be estimated based on population and <br />development plans and trends. <br />. Future flows will be compared to existing infrastructure capacities and needed <br />new or upgraded facilities will be sized. <br />. Traffic counts at three intersections <br />. Signal warrant study at three intersections. <br /> <br />Docu mentation <br /> <br />. Plan View Layout of revise street pattern <br />. Street, roadway and "new" sidewalk at parking <br />. Intersection layout (3) <br />. ROW requirements (corner clips only) <br />. Cross section of each new street layout. <br /> <br />URS Corporation <br />9801 Westheimer,Suite 101 <br />Houston,Texas 77042 <br />Tel: 713789-9801 <br />Fax: 7137898404 <br />