My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
04-06-09 Regular Meeting of the La Porte Development Corporation Board of Directors
LaPorte
>
City Secretary
>
Minutes
>
La Porte Development Corporation/Type B
>
2000's
>
2009
>
04-06-09 Regular Meeting of the La Porte Development Corporation Board of Directors
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2017 3:22:25 PM
Creation date
3/21/2025 2:44:15 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
La Porte Development Board Corporation/Type B
Meeting Doc Type
Minutes
Date
4/6/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />April 14, 2009 <br /> <br />CITY OF LA PORTE FIVE POINTS PLAZA <br /> <br />ADDENDUM NO.2 <br /> <br />BID PROPOSAL <br /> <br />To: City of La Porte <br />2963 N. 23rd Street <br />La Porte, TX 77571 <br /> <br />GENTLEMEN: <br /> <br />THE UNDERSIGNED BIDDER, having examined the plans, specifications, and other proposed Contract <br />Documents, and all Addenda thereto and being acquainted with the fully understanding: <br /> <br />(a) the extent and character of the work covered by this proposal; <br /> <br />(b) the location, arrangement, and specified requirements for the proposed work; <br /> <br />(c) the location, character, and condition of existing facilities, pavements, walks, driveways, gutters, <br />trees, and utilities, which may affect or be affected by the proposed work; <br /> <br />(d) the natural and extent of the work to be made, and the type, character and general condition of <br />materials to be excavated; <br /> <br />(e) the difficulties and hazards to the work which might be caused by bad weather; <br /> <br />(f) local conditions relative to labor, transportation, hauling an rail delivery facilities; <br /> <br />(g) all other factors and conditions affecting or which may be affected by the work. <br /> <br />WE HEREBY PROPOSE to furnish all required materials, supplies, equipment, tools, and to perform all <br />necessary labor and supervision; and to construct, install, erect, equip, and complete all work stipulated <br />in, required by, and in accordance with the contract documents and the plans, specifications, and other <br />documents referred to therein (as altered, amended, or modified by all addenda thereto) for and in <br />consideration of the following prices: <br /> <br />ADDENDUM 2 <br />BID PROPOSAL <br /> <br />Bidder's Initials Jf'N, <br />
The URL can be used to link to this page
Your browser does not support the video tag.