Laserfiche WebLink
<br />AGENDA ITEM 4: <br /> <br />CONSIDER APPROVAL OR OTHER ACTION REGARDING THE FINAL DRAFT OF <br />THE TAYLOR BAYOU WATERSHED STUDY <br /> <br />At the last board meeting we reported that CivilTech was making the final changes to the Draft <br />Report on the Taylor Bayou Watershed. Enclosed is a staff memorandum from Robert <br />Cummings, summarizing the concerns/issues raised by staff during our preliminary review, the <br />actions taken by the consultant and the resulting effect on the study. The cumulative effect of the <br />changes decreased the amount of detention in "Pond C" by 14 Ac Ft. <br /> <br />This study will be utilized in our discussion with prospective developers to guide development <br />within the TIRZ Boundary and the Taylor Bayou Watershed. It has already been shared with the <br />Engineering Consultants (Brown & Gay) that are designing the residential subdivision presently <br />known as the Golf Course Community. <br /> <br />Action <br />To accept the Final Draft of the Taylor Bayou Watershed Study. <br />