Laserfiche WebLink
<br /> <br />City of La Porte Planning Department <br />MEMORANDUM <br />December 16, 2003 <br /> <br />TO: <br /> <br />John Joerns, Assistant City Manager <br /> <br />Robert A. Cummings, Supervising Engineer MC- <br /> <br />FROM: <br /> <br />CC: <br /> <br />Nick Finan, Interim Director of Planning <br /> <br />RE: <br /> <br />Taylor Bayou Drainage Study Summary <br /> <br />SUMMARY <br /> <br />Items of concern after 8/27/03 reVIew of revised Taylor Bayou Wastershed Master <br />Drainage Plan report: <br /> <br />. Size and storage volume of regional detention pond at the intersection of McCabe <br />Road and Broadway. <br />. Exact location of regional detention pond at the intersection of McCabe Road and <br />Broadway including the concern over portions of the pond having to be located <br />south of McCabe road. <br />. Inclusion of area east of Broadway in A I 04A4 drainage subarea. <br />. Was the golf course area modeled at a developed or undeveloped rate? <br />. The total amount of runoff from the watershed seemed high. <br />. An assumption that the A I 04A2 subarea would develop as large commercial and <br />multi-family housing. <br /> <br />Actions taken by engineering consultant (CivilTech Engineering, Inc) on the project: <br /> <br />. Removed proposed portion of the regional detention pond at McCabe Road and <br />Broadway that was shown to be south of McCabe Road. <br />. Moved same detention pond west to preserve zoned residential area at northwest <br />comer of intersection of McCabe Road and Broadway and to line up east side of <br />detention pond with the existing A104-12-01 creek. <br />