Laserfiche WebLink
PORT CROSSING INFRASTRUCTURE BID SUMMARY <br />Total Base Unit Prices <br />Site Preparation Base Unit Price <br />Storm Drainage Improvements Base Unit Price <br />Small Diameter Water Main Base Unit Price <br />Sanitary Sewer Base Unit Price <br />Pavement Construction Base Unit Price <br />Temporary Traffic Control Base Unit Price <br />Permanent Traffic Control & Signage Base Unit Price <br />Export Drive Base Unit Price <br />Total Extra Unit Prices <br />TOTAL BASE BID PRICE <br />Revise Concrete Paving to 10" thickness <br />TOTAL REVISED BID after 10" paving <br />Adjustments due to Changes in Plans <br />TOTAL REVISED BID after adjustments <br />Angel Brothers ' <br />Durwood Greene JHarris <br />1,053,010.00 <br />1,234,700.00 <br />1,071,400.00 <br />2,122,504.50 <br />1,939,927.00 <br />2,006,724.32 <br />313,906.00 <br />282,876.00 <br />269,134.85 <br />442,413.50 <br />570,655.00 <br />588,218.97 <br />1,233,325.62 <br />1,206,172.90 <br />1,296,398.91 <br />4,200.00 <br />10,000.00 <br />10,000.00 <br />1,650.00 <br />10,750.00 <br />34,173.53 <br />712,633.98 <br />687,605.75 <br />651,190.78 <br />$111,200.00 $69,100.00 $96,600.00 <br />$ 5,994,843.60 $ 6,011,786.65 $ 6,023,841.36 <br />$387,502.50 $380,121.50 $433,264.70 <br />$6,382,346.10 $6,391,908.15 $6,457,106.06 <br />$ (128,005.00) $ (127,895.00) $ (142,569.00) <br />$6,254,341.10 $6,264,013.15 $6,314,537.06 <br />