PORT CROSSING INFRASTRUCTURE BID SUMMARY
<br />Total Base Unit Prices
<br />Site Preparation Base Unit Price
<br />Storm Drainage Improvements Base Unit Price
<br />Small Diameter Water Main Base Unit Price
<br />Sanitary Sewer Base Unit Price
<br />Pavement Construction Base Unit Price
<br />Temporary Traffic Control Base Unit Price
<br />Permanent Traffic Control & Signage Base Unit Price
<br />Export Drive Base Unit Price
<br />Total Extra Unit Prices
<br />TOTAL BASE BID PRICE
<br />Revise Concrete Paving to 10" thickness
<br />TOTAL REVISED BID after 10" paving
<br />Adjustments due to Changes in Plans
<br />TOTAL REVISED BID after adjustments
<br />Angel Brothers '
<br />Durwood Greene JHarris
<br />1,053,010.00
<br />1,234,700.00
<br />1,071,400.00
<br />2,122,504.50
<br />1,939,927.00
<br />2,006,724.32
<br />313,906.00
<br />282,876.00
<br />269,134.85
<br />442,413.50
<br />570,655.00
<br />588,218.97
<br />1,233,325.62
<br />1,206,172.90
<br />1,296,398.91
<br />4,200.00
<br />10,000.00
<br />10,000.00
<br />1,650.00
<br />10,750.00
<br />34,173.53
<br />712,633.98
<br />687,605.75
<br />651,190.78
<br />$111,200.00 $69,100.00 $96,600.00
<br />$ 5,994,843.60 $ 6,011,786.65 $ 6,023,841.36
<br />$387,502.50 $380,121.50 $433,264.70
<br />$6,382,346.10 $6,391,908.15 $6,457,106.06
<br />$ (128,005.00) $ (127,895.00) $ (142,569.00)
<br />$6,254,341.10 $6,264,013.15 $6,314,537.06
<br />
|