My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
11-21-1991 Public Hearing and Regular Meeting of La Porte Planning and Zoning Commission
LaPorte
>
City Secretary
>
Minutes
>
Planning & Zoning Commission
>
1990's
>
1991
>
11-21-1991 Public Hearing and Regular Meeting of La Porte Planning and Zoning Commission
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2017 11:50:37 AM
Creation date
3/21/2025 2:53:44 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
Planning & Zoning Commission
Meeting Doc Type
Minutes
Date
11/21/1991
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />DRAFT <br /> <br />November 12, 1991 <br /> <br />H. Carlos Smith, Engineers & Surveyors, Inc. <br />Attn: Mr. H. Carlos Smith, P.E. <br />P.O. Box 529 <br />La Porte, Texas 77572-0529 <br /> <br />Re: Briar Grove Park Section I (Formerly Meadow Park II) <br />Dear Mr. Smith, <br /> <br />On March 15, 1984 the City's Planning & Zoning Commission granted conditional <br />approval for the final plat of Meadow Park Section II and City staff gave conditional Notice <br />to Proceed for construction of the Public Improvements. Although many of the Public <br />Improvements were constructed, they were not accepted by the City for ownership and <br />maintenance. Since construction was never completed and the plat for Meadow Park II <br />never recorded, the City's Planning & Zoning Commission will need to consider <br />conditional approval of the preliminary plat as Briar Grove Park Section I and the concept <br />of phasing it into two (2) Sections as proposed by your client. This item is on the <br />Planning & Zoning Commission's agenda for November 21, 1991. As you know, several <br />issues regarding completion of the Subdivision remain unresolved. This letter will serve <br />as a tentative list of those issues. <br /> <br />1) Provide the City of La Porte with construction plans and specifications <br />for the water, sanitary sewer, storm drainage, and street construction <br />of the subdivision. <br /> <br />2) Construct the relocation of the 6" water line and the 2" gas line <br />located in the drainage ditch on the north side of Ave. "P" so that the <br />drainage flow line can be lowered to take the storm water off the <br />property. <br /> <br />3) Complete the construction of the water lines, sanitary sewer system <br />and the storm drainage, making sure the connection on Ave. "P" <br />conforms to the construction drawings. <br /> <br />4) Schedule and re-test the water and sewer lines, with City personnel <br />present, for compliance with the approved specifications and provide <br />those test results to the City. <br /> <br />EXH1BIT C <br />
The URL can be used to link to this page
Your browser does not support the video tag.