My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
06-19-1997 Workshop Meeting, Regular Meeting, and Public Hearing of the La Porte Planning and Zoning Commission
LaPorte
>
City Secretary
>
Minutes
>
Planning & Zoning Commission
>
1990's
>
1997
>
06-19-1997 Workshop Meeting, Regular Meeting, and Public Hearing of the La Porte Planning and Zoning Commission
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2022 2:52:19 PM
Creation date
3/21/2025 2:54:42 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
Planning & Zoning Commission
Meeting Doc Type
Minutes
Date
6/19/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • <br />Planning and Zoning Commission <br />Minutes of June 19, 1997 <br />Page 7 of 9 <br />A motion was made by Eugene Edmonds to disapprove the General Plan for the <br />Bayou Forest Subdivision and Bayou Forest Apartments. The motion was seconded <br />by Melton Wolters. All were in favor and the motion passed. <br />X N. CONSIDER APPROVAL OF THE GENERAL PLAN FOR THE BAYOU <br />FOREST APARTMENTS, PHASE I. <br />Mr. Rankin presented staff's report. Staff reviewed the General Plan for the Bayou <br />Forest Apartments, Phase I and recommended approval with several conditions. <br />A motion was made by Eugene Edmonds to approve the General Plan for the Bayou <br />Forest Apartments, Phase I with the following conditions: <br />1. The developer shall provide the City with a General Plan that shows the <br />phase development. The current 10.54 acres could be considered Phase I <br />and the remaining 6.46 acre PUD tract could be Phase H. <br />2. A construction schedule for the 10.54 acre and 6.46 acre tract shall be <br />Provided. <br />3. The Special Conditional Use Permit (SCUP) required for a PUD <br />development is approved by the Planning and Zoning Commission and <br />City Council. Upon approval, the SCUP information shall be reflected <br />on the General Plan. <br />4. Water and sewer extensions shall be required. <br />5. See General Plan checklist for additional items. <br />6. A portion of the NC zone corner tract has been included into the <br />proposed apartment development. This piece was to provide access to <br />the site, however, the driveway location conflicts with City zoning <br />regulations. This mint be corrected <br />7. The developer shall address interior development issues such as <br />easements (on site and east of the proposed site), drive access aisles, <br />building setback problems, etc. <br />8. Current access to public rights -of -way create congestion or dangers and <br />is not adequate for the safety of the project residents and the general <br />public. This must be corrected <br />9. Plantings or landscaping shall be shown. <br />
The URL can be used to link to this page
Your browser does not support the video tag.