Laserfiche WebLink
Planning and Zoning Commiss~ ~ • <br />Minutes of November 29, 2001 <br />Page 2 <br />Motion by Ralph Dorsett to approve the Preliminary Plat of Spencer Landing, <br />Section 4, with the following condition: <br />- Sidewalks shall be installed along both sides of all public streets and the <br />south side of "D" Street continuing along to Section 3: . ~ ~ ..' <br />Second by Melton Wolters. All were in favor and the motion carried <br />V. CONSIDER FINAL PLAT FOR FAIRMONT PARK EAST, SECTION 10. <br />'Ms. Goodwin presented staff's report. On July 19, 2001, the Commission approved <br />the Preliminary Plat for Fairmont Park East, Section 10. Staff has reviewed the Final <br />Plat and found it complies with Development Ordinance requirements. Staff <br />recommended approval of the plat with items to be addressed prior to recordation. <br />Eddie Gray, Developer of Fairmont Park Subdivision, addressed the Commission. Mr. <br />Gray asked the Commission to omit staff's recommendation, which would require <br />dedication of a pedestrian easement along the pipeline easement, prior to recordation <br />of the Final Plat. Mr. Gray introduced a letter he had written to Exxon Mobile <br />Pipeline Company informing them of the City's plans to build a pedestrian walkway <br />from Fairmont Parkway to Spencer Highway along the pipeline easement. In the <br />letter he asked Exxon Mobile if they had any jurisdiction that would prohibit the <br />City from locating a pedestrian walkway along the easement. He is awaiting their <br />response. Mr. Gray agreed to provide a letter of commitment stating his willingness <br />to work with the City to make the pedestrian walkway a reality. When the time <br />comes; he will more than likely deed afifty-foot strip to the City rather than provide <br />an easement. <br />Motion by Ralph Dorsett to approve the Final Plat of Fairmont Park East, <br />Section 10, subject to the following items being addressed prior to recordation of <br />the plat: <br />- All construction improvements shall be completed at site. <br />- Sidewalks shall be constructed in the following places: <br />1. Build sidewalks to connect the development with the adjacent <br />school property. (e.g. From the development, begin sidewalks along <br />the south side of Spencer Highway leading into the school's <br />driveway to connect into the school's existing internal pedestrian <br />pathway.) <br />2. Build sidewalks eastbound to connect with existing sidewalk on <br />Spencer Highway (e.g. Begin at the subdivision's entrance (Eagle <br />Nest Drive), and connect with sidewalk at the Chevron gas station). <br />