Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />City of La Porte <br />Special Conditional Use Permit /I SCU02-o01 <br /> <br />This permit is issued to: <br /> <br />Ameen Narsi of Narsi. Inc. <br />Owner or Agent <br /> <br />301 W. Barbour's Cut Boulevard. La Porte. TX <br />Address <br /> <br />For Development ot <br /> <br />Convenience store with automobile & truck fueling <br />Development Name <br /> <br />301 W. Barbour's Cut Boulevard. La Porte. TX <br />Address <br /> <br />Legal Description: <br /> <br />2.9 acres. being lots 1 thru 32 of Block 329. including alley and portion of <br />North 2nd Street right-of-way. out of Johnson Hunter Survey. City of La Porte. <br />Harris County. Texas. <br />\ <br /> <br />Zoning: <br /> <br />Business Industrial <br /> <br />Use: <br /> <br />Convenience Store & AutolTruck Fueling <br /> <br />Permit Conditions: <br /> <br />1. The facility shall only operate during daytime hours (6 a.m. to 8 p.m.). <br />2. The facility shall be operated and maintained properly. <br />3. No overnight facilities are allowed on the premises. <br />4. North 31d Street will be improved south of the existing paving for approximately 270'. <br />5. Mleast 15% landscaping and screening must be provided along 111, 31d <br />6. and North "E" streets as a buffer between the neighborhood and the proposed facility. This must be compatible with <br />cunenf landscaping scheme along Barbour's CUt Blvd. <br />7. No permanent structures are allowed in the City's 60' drainage easement. <br />8. For this phase of development, ingress and egress are limited to 2 points along Barbour's CUt Blvd. The second driveway <br />provides shared access between Blocks 328 & 329. <br />9. Applicant must submit to the City written approval from Harris County for median break(s) along Barbour's CUt Blvd. <br />10. Driveway turning radii shall be increased to accommodate trucks. <br />11. Automobile and truck traffic must be separated. Signs are placed at each driveway denoting "auto" or "truck" entranoe/exil <br />12. Street improvement must adhere to the Harris County Engineering Department's design standards for commercial/industrial <br />roadways. <br /> <br />Failure to begin construction within one (1) year after issuance or as scheduled under the terms of a special <br />conditional use permit shall void the permit as approved, except upon an extension of time granted after <br />application to the Planning and Zoning Commission. <br /> <br />If construction is terminated after completion of any stage and there is ample evidence that further <br />development is not contemplated, the ordinance establishing such special conditional use permit may be <br />rescinded by the City Council, upon its own motion or upon the recommendation of the Planning and Zoning <br />Commission of the City of La Porte, and the previous zoning of the entire tract shall be in full effect on the <br />portion which is undeveloped. <br /> <br />Validation Date: June 10. 2002 <br /> <br />Director of Planning <br /> <br />City Secretary <br /> <br />EXH"'~F <br />