My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
06-19-2003 Regular Meeting and Public Hearing of the La Porte Planning and Zoning Commission
LaPorte
>
City Secretary
>
Minutes
>
Planning & Zoning Commission
>
2000's
>
2003
>
06-19-2003 Regular Meeting and Public Hearing of the La Porte Planning and Zoning Commission
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2017 11:50:34 AM
Creation date
3/21/2025 2:55:52 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
Planning & Zoning Commission
Meeting Doc Type
Minutes
Date
6/19/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • <br />La Porte Golf Community <br />SCU03-002 <br />August 27, 2003 <br />Page 4 of 6 <br />responsible for routine maintenance of these detention azeas down to the <br />water level. <br />Parks and Open Space -The proposed subdivision is in close <br />proximity to the City's Little Cedar Bayou Pazk. The proposed <br />subdivision can be made accessible to Little Cedaz Bayou Pazk and <br />connect into the City's trails/pedestrian system with the installation of <br />sidewalks, (along McCabe, Wharton Weems and SH 146), and other <br />pedestrian facilities (i.e. trails along from SH 146 to Little Cedaz Bayou <br />Park). <br />The plan also shows several reserves serving as pocket pazks and open <br />spaces. In addition to the passive pazk/detention areas, the development <br />proposal could include in its deed restrictions that these azeas are private <br />and maintenance would be the responsibility of the Homeowner <br />Association. The Developer could submit to the City for approval a park <br />plan showing the playground equipment that will be installed. Staff <br />suggests pedestrian bicycle trails to be incorporated along the <br />detention/pazk areas at several points into the subdivision. This would <br />connect the developments private azeas with the public (City owned) trail <br />system. <br />• Construction Schedule -The development schedule provided by the <br />developers indicates January 2004, as an~approximate starting date, April <br />2011 as an approximate completion date for all seven sections. <br />Recommendation: ~ ~ Based on items discussed under the "Analysis" section, Staff recommends <br />Planning and Zoning Commission's consideration of the proposed land uses, <br />and if positive, directing Staff to work with the Developer to place the <br />following conditions in a Development Agreemenrt for adoption of a Special <br />Conditional Use Permit. The conditions are listed below: <br />Land Use: <br />1. Allow single-family lots with 70' along the Golf Course and <br />60' to 65' width lots in other areas. <br />2. Redesign the single-family lot layout so that lots do not front <br />on 8~' Street. <br />3. Allow multi-family development near McCabe & SH 146. The <br />Development Agreement could determine density and <br />driveway access. <br />4. Allow commercial development near McCabe & SH 146. A <br />further refinement of the commercial activity will be <br />determined when the Development Agreement is created. <br />
The URL can be used to link to this page
Your browser does not support the video tag.