My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
06-17-2004 Regular Meeting and Public Hearing of the La Porte Planning and Zoning Commission
LaPorte
>
City Secretary
>
Minutes
>
Planning & Zoning Commission
>
2000's
>
2004
>
06-17-2004 Regular Meeting and Public Hearing of the La Porte Planning and Zoning Commission
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2022 3:08:00 PM
Creation date
3/21/2025 2:56:13 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
Planning & Zoning Commission
Meeting Doc Type
Minutes
Date
6/17/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. Special Conditional Use PermitlSCU04-010 <br />Planning and Zoning Commission <br />July 15, 2004 <br />• Additional Landscaping should be'placed along the entire front and both sides for a depth of at least . <br />100' and at a width of at least 5'.. This landscaping should be sight bearing. Landscaping plan to be <br />approved by the City. <br />• A masonry wall shall surround the complex. No bay doors shall be facing Underwood:. The facility <br />shall have a masonry front facade as indicated in the applicant's renderings. <br />• Facility lighting shall be arranged as to reflect the light away from the adjacent residential properties. <br />• All outside storage shall be screened from public view by positioning in the center of the complex. <br />• Enhance building facade so that it blends with the existing commercial to be architecturally and <br />aesthetically similar. - <br />• Utility extension and maintenancetrepair of paved driveway over pipeline easement will be. the <br />responsibility of the owner/developer. <br />• All non -service transmission pipeline crossings must have the approval of the' pipeline company. <br />• . Ensure that maximum lot coverage does not exceed 40%. <br />• Provide on -site detention for the development and -design in such a way to:not inhibit -normal sheet - <br />flow of adjacent properties. <br />• This permit does not become valid until: a formal 'Minor Development Site .Plan and .Plat are <br />submitted . to the City; reviewed and approved in. accordance with the requirements of the. <br />Development Ordinance. <br />• . The: Developer shall comply with all applicable -laws and ordinances of the City and the State of <br />Texas. <br />Actions required by the Commission: <br />• Recommend to Council approval of this SCUP withconditions: <br />• : Recommend to Council denial of this SCUP. <br />
The URL can be used to link to this page
Your browser does not support the video tag.