My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
06-16-2005 Regular Meeting and Workshop Meeting of the La Porte Planning and Zoning Commission
LaPorte
>
City Secretary
>
Minutes
>
Planning & Zoning Commission
>
2000's
>
2005
>
06-16-2005 Regular Meeting and Workshop Meeting of the La Porte Planning and Zoning Commission
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2017 11:50:33 AM
Creation date
3/21/2025 2:56:30 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
Planning & Zoning Commission
Meeting Doc Type
Minutes
Date
6/16/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i,_ <br />• • City of La Porte • <br />Special Conditional Use Permit # SCU 03-001 <br />This permit is issued to: Port of Houston Authority <br />Owner or Agent <br />P.O. Box 2562 Houston. TX 77252 <br />Address <br />For Development of: Port of Houston Authority Pre-check truck facility <br />Development Name <br />East Barbour's Cut Blvd, La Porte. TX <br />Address <br />Legal Description: 20.7 acres of land being lots 17-32 of block 438. lots 1-32 block 439 and <br />adioining alley. lots 1-16 block 974. lots 1-32 of blocks 975 through 979 and <br />adjoining alleys within these blocks and portions of 10.11 ,and 12 Aves. <br />Brownell. Nugent. Holmes and Carroll Streets. out of the Johnson Hunter <br />League. A-35 City of La Porte. Hams County. Texas. <br />Zoning: Planned Unit Development fPUD) <br />Use: Pre-check truck facility <br />Permit Conditions: <br />1. Adhere to the terms of the Property Owners Value Assurance Program (as described in Exhibit F-1). <br />2. Sign an interiocal agreement with the City of La Porte regarding the Property Owners Value Assurance <br />Program. <br />3. Comply with the General Plan approved by the City as shown in the attached Exhibit F-2. <br />4. Ensure that at least 30 percent of the property consists of landscaping and/or screening. <br />5. Provide detailed landscape and screening plans during site plan submittal. Allow existing trees and <br />shrubs to remain as natural buffer. Provide "in fill" plantings of trees and shrubs. <br />6. Provide an irrigation system to ensure that all landscaping and screening is properly maintained by the <br />owner/developer. <br />7. Erect a sound wall constructed with a "rough" texture to decrease the likelihood of graffiti and to <br />increase the likelihood that vines/greenery will attach to the wall. <br />8. Adhere to the provisions and details shown in facilities lighting plan. Ensuring that all illumination occurs <br />on site and does not affect nearby residences. <br />9. Enhance the building fagade so that it is architecturally and aesthetically pleasing. The Planning and <br />Zoning Commission must approve the design. <br />10. Prohibit the overnight parking of trucks at the facility between 6 pm and 6 am. <br />11. Hours of operation shall be no earlier than 7 am and no later than 6 pm. <br />12. Pay the public hearing costs. <br />13. Comply with all other applicable laws and ordinances of the City of La Porte and the State of Texas. <br />Failure to begin construction within 12 months after issuance or as scheduled under the terms of a special <br />conditional use permit shall void the permit as approved, except upon an extension of time granted after <br />application to the Planning and Zoning Commission. <br />If construction is terminated after completion of any stage and there is ample evidence that further development <br />is not contemplated, the ordinance establishing such special conditional use permit may be rescinded by the <br />City Council, upon its own motion or upon the recommendation of the Planning and Zoning Commission of the <br />City of La Porte, and the previous zoning of the entire tract shall be in full effect on the portion which is <br />undeveloped. <br />Validation Date: ~~( ~"V.~ <br />t <br />Dire ~ Planning ~~ <br />City Sec etary <br />.~~ _ <br />
The URL can be used to link to this page
Your browser does not support the video tag.