My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
08-18-2005 Regular Meeting and Public Hearing of the La Porte Planning and Zoning Commission
LaPorte
>
City Secretary
>
Minutes
>
Planning & Zoning Commission
>
2000's
>
2005
>
08-18-2005 Regular Meeting and Public Hearing of the La Porte Planning and Zoning Commission
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2017 11:50:33 AM
Creation date
3/21/2025 2:56:32 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
Planning & Zoning Commission
Meeting Doc Type
Minutes
Date
8/18/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />Preserve at Taylor Bayou - Preliminary Plat <br />Planning and Zoning Commission <br />September 15, 2005 <br /> <br />. <br /> <br />Location of Proposed Development 1200 Block of McCabe Road <br />Legal Description TRS 8, 8A, SF-I, 49, 49A, & 9B; W. P. Harris <br /> Survey, A-30. <br />Applicant Robert Burchfield <br />Present Zoning Planned Unit Development (PUD) <br />Project Name Preserve at Taylor Bayou <br />Acreage 42 acres (residential), 65 acres (nature preserve) <br />Surrounding Zoning North Planned Unit Development (PUD) <br /> East Low Density Residential (R-l) <br /> South Low Density Residential (R-l) <br /> West Planned Unit Development (PUD) <br />Land Use Map Residential <br />Activity Proposed Single-Family, Multi-Family Residential, <br /> Townhomes, Commercial and Nature Preserve <br /> <br />Summary: <br />. This project has an approved General Plan and SCUP. The current submittal is a Preliminary Plat for <br />proposed development known as Preserve at Taylor Bayou.. <br />. The subject property is located at the southeast comer of McCabe Road at SH 146 near Taylor Bayou. <br />. The property being platted consists of approx.42 acres out of 107 acres tract located south of McCabe Road <br />and the easterly right-of-way line of State Highway 146. <br />. The applicant is proposing single-family residential, multi-family, townhouses, and commercial <br />development at this site. Corresponding densities meet densities allowed by the strict compliance of <br />Chapter 106 (Zoning). <br />. The current proposal still intends to dedicate a 65 acre nature preserve. <br />. The plan also shows two points of entrance/exit along McCabe Road. <br />. The applicant has stated that funding for the said project is in place. The funding for the trails will be <br />determined once a decision is made about ownership of the Nature Preserve. Harris County has expressed <br />an interest in the Preserve dedication. <br />. A new lift station is proposed near the east end of the property and McCabe Road in accordance with the <br />City's sanitary sewer master plan for this area. Army Corps of Engineers has issued a preliminary opinion. <br />. It is anticipated that the proposed development will be hooked up to the new 24" trunk main going north for <br />sanitary sewer. <br />. The Environmental Assessment and Traffic Impact Analysis studies have been completed for the said <br />project. <br /> <br />Recommendation: <br /> <br />Based on the above analysis, staff believes there are some outstanding issues still to be resolved. The developer <br />will need to coordinate with the north side development in the area of utility planning and the preserve <br />dedication. Should the Commission wish to approve the Preliminary Plat in its present format, we recommend <br />the following conditions: <br /> <br />. Final Plat and Construction drawings shall indicate all infrastructure and site drainage improvements to <br />ensure adequate capacity and proper site drainage. <br /> <br />. Developer is responsible for installation of sidewalks along both sides of all right-of-ways within the <br />complex, east and west sides along McCabe Road towards the end of the subdivision line. <br /> <br />. Developer must secure a maintenance bond, according to the City's multi-family provisions, or seek an <br />approved alternate showing evidence of bonding insurance or participate in a "reserve fund <br />mechanism" that establishes an account for the sole purpose of maintenance to the apartment project. <br />This fund is for the lifetime of the project. <br /> <br />. Detention ponds ownership and maintenance by the HOA shall be stated on the fmal plat. <br /> <br />_UfIDW A <br />
The URL can be used to link to this page
Your browser does not support the video tag.