Laserfiche WebLink
<br />Port Crossing <br />Final Plat <br />Page 4 of 4 <br /> <br />Options available to the Commission are as follows: <br /> <br />. Approval of the Final Plat withholding signature and recordation until <br />the above are complied. This will authorize the developer to begin <br />construction ofthe subdivision improvements. <br /> <br />. Disapproval of the Final Plat and supporting documents as filed. This <br />will require the developer to file a new Final Plat with the required <br />documents. <br />