My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
03-15-07 Regular Meeting and Public Hearing of the LP Planning and Zoning Commission
LaPorte
>
City Secretary
>
Minutes
>
Planning & Zoning Commission
>
2000's
>
2007
>
03-15-07 Regular Meeting and Public Hearing of the LP Planning and Zoning Commission
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2017 11:50:33 AM
Creation date
3/21/2025 2:56:59 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
Planning & Zoning Commission
Meeting Doc Type
Minutes
Date
3/15/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Planning and Zoning Commission <br />Minutes of March 15,2007, Meeting <br />Page 4 of 6 <br /> <br />· All lighting in the parking lot shall be hooded and arranged to deflect light away from <br />the adjoining properties in compliance with Section 106-521 (a) of the Code of <br />Ordinances. <br />· The Developer shall comply with all applicable laws and ordinances of the City and <br />the State of Texas. <br /> <br />Second by Paul Berner. The Motion carried. <br /> <br />Ayes: <br />Nays: <br />Abstain: <br /> <br />Berner, Barrera, Linscomb, Kaminski, Meharg, Muston, and Lawler. <br />None <br />None <br /> <br />9. CONSIDER REPLAT FOR PROPOSED RETREAT AT BAYFOREST NORTH TO BE <br />LOCATED ALONG SOUTH BROADWAY. <br /> <br />Mr. Malik presented staffs report on a request by Don Meeks for a replat of Bayforest <br />North Subdivision located along South Broadway. The previous plat approval included <br />18 lots, which would be reduced to 16 lots if approved as requested. <br /> <br />Don Peebles, of Goldston Engineering, answered questions from the Commission. <br /> <br />Staff recommended approval of the replat and outlined the items that should be <br />completed prior to recordation of the plat <br /> <br />Motion by Claude Meharg to approve the replat of Bayforest North Subdivision with the <br />following items being addressed prior to recordation of the plat: <br /> <br />· All construction improvements are complete at site. <br />· Fencing specifications and standards shall be stated in the CCRs and must be <br />approved by the City. <br />· Sidewalks shall be installed along both sides of all public streets and along the south <br />side of South US" Street up to South Broadway. <br />· Payment of $244.36 shall be made to the City for street sign installation. <br />· Payments of $2,530.00 and $1,896.36 shall be made to the City for streetlight <br />installation and one-year service cost respectively. <br />· Payment of $9,450.00 shall be made to the City in lieu of parkland dedication (vested <br />under previous ordinance). <br /> <br />Second by Paul Berner. The motion carried. <br /> <br />Ayes: <br />Nays: <br />Abstain: <br /> <br />Berner, Barrera, Linscomb, Kaminski, Meharg, Muston, and Lawler. <br />None <br />None <br /> <br />10. CONSIDER REPLAT FOR PROPOSED RETREAT AT BAYFOREST SOUTH TO BE <br />LOCATED ALONG SOUTH BROADWAY AT WHARTON WEEMS BLVD. <br /> <br />Mr. Malik presented staffs report on a request by Don Meeks for a replat of Bayforest <br />South Subdivision located along South Broadway at Wharton Weems Blvd. The previous <br />plat included 10 lots, which would be increased to 12 lots if approved as requested. <br /> <br />Don Peebles, of Goldston Engineering, answered questions from the Commission. <br />
The URL can be used to link to this page
Your browser does not support the video tag.