Laserfiche WebLink
<br />Replat for GRY Subdivision <br />7/19/07 - P & Z Meeting <br />Page 2 of2 <br /> <br />. There is compliance with Sections 212.014 and 212.015 of the V.T.C.A. <br />Local Government Codes. <br /> <br />These are the sections of State Law dealing with platting and <br />replatting. These provisions have been satisfied. <br /> <br />. The replat has been approved by the Commission after being prepared <br />and filed as though it were an original plat as specified in Section 4.04 of <br />the Development Ordinance. <br /> <br />Staff fmds the replat document meets applicable ordinance <br />requirements. <br /> <br />. All expenses incurred by the City or the subdivider in the replat process <br />shall be borne by the subdivider, including the cost for notice of public <br />hearing. <br /> <br />This requirement has been satisfied. <br /> <br />Land Use: Review of the City's Land Use Plan indicates this area is <br />envisioned as developing for commercial use. The proposed project shall be <br />primarily for commercial uses permitted per Section 106-441, Table A, of <br />the Code of Ordinances. <br /> <br />Access Management & Layout: Spencer Highway, a 100' right-of-way, is <br />a primary arterial! access highway. Since traffic movement is the primary <br />function of this arterial roadway, access management is essential. Staff and <br />the developer need to work on restricting the driveway access of all <br />commercial lots that front on Spencer Highway. Therefore, a 28' shared <br />access easement (ingress & egress) is shown between lots 5 and 6 along <br />Spencer Highway. In addition, existing drive to the southeast corner along <br />Spencer Highway shall be removed. <br /> <br />Sidewalks - Section 5.02 of the Development Ordinance addresses the <br />need for sidewalks, where required by the Comprehensive Plan or by the <br />Commission. For recent developments in this area, the Commission chose <br />to require sidewalks. In keeping with this standard, sidewalks shall be <br />installed along Spencer Highway with the development of lots 5 & 6. A <br />note is placed on the face of the plat. <br /> <br />Conclusion: <br /> <br />Staff finds the requested replat of Part of Lot 10, Block 2, W. J. Payne <br />Subdivision, satisfies applicable provisions of State Law and City <br />Ordinance. <br /> <br />Staff recommends approval with the condition that the plat not be released <br />for recordation until all the required signatures are noted. <br />