Laserfiche WebLink
<br />Preserve at Taylor Bayou <br />March 19,2009 <br />Page 5 of5 <br /> <br />12. Section III (proposed mitigation pond) must be developed <br />simultaneously with the development of Section V (proposed multi- <br />family development). <br />13. Is proposed Bayou Forest Drive (Section IX) a public or private street? <br />Provide a copy of recorded document. Indicate if the street shall be <br />constructed per City's standard specs. and the owner/developer shall <br />be responsible for its maintenance. Please state the purpose, extent of <br />development, dead end to SH 146, and timeline for its construction. <br />14. What is the purpose of proposed berm along State Highway 146 - <br />submit plans, indicate timeline of construction, and identify the <br />developer on the plan. <br />15. Storm sewer is proposed under pavement. Explain 30' drainage <br />easement to the southwest along State Highway 146. <br />16. Furnish wetland delineation permit & extension from Army Corps of <br />Engineers. Approval of overflow structure by Harris County Flood <br />Control District and the City shall be required. <br />17. Show sidewalks along McCabe Road commencing from Taylor Bayou <br />to SH 146. <br />18. Submit a proposed schedule of construction. The development <br />schedule shall indicate the approximate starting date of each phase of <br />the development. <br /> <br />Options available to the Commission are: <br /> <br />. Approve the General Plan as filed; <br /> <br />. Conditionally approve the General Plan as fIled, provided, the reasons <br />for such conditional approval are stated in writing and a copy of the <br />statement is signed by the Chairman of the Planning and Zoning <br />Commission. <br /> <br />. Disapprove the General Plan as filed, provided, the reasons for such <br />disapproval are stated in writing and a copy of the statement is signed by <br />the Chairman of the Planning and zoning Commission. <br />